Jon Tømmerås Selvik
According to our database1,
Jon Tømmerås Selvik
authored at least 14 papers
between 2011 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2024
Integrating structure time series forecasting and multicriteria decision analysis for adaptive operational risk assessment: an empirical study using real-time data.
Int. J. Syst. Assur. Eng. Manag., July, 2024
2021
On the use of the 'Return Of Safety Investments' (ROSI) measure for decision-making in the chemical processing industry.
Reliab. Eng. Syst. Saf., 2021
2020
Addressing human error when collecting failure cause information in the oil and gas industry: A review of ISO 14224: 2016.
Reliab. Eng. Syst. Saf., 2020
On the importance of systems thinking when using the ALARP principle for risk management.
Reliab. Eng. Syst. Saf., 2020
Prioritising investments in safety measures in the chemical industry by using the Analytic Hierarchy Process.
Reliab. Eng. Syst. Saf., 2020
Safety-Instrumented Systems in Oil and Gas Improved Situational Awareness with Embedded Signature Curves in Mimics.
Int. J. Perform. Eng., 2020
SMART Criteria for Quality Assessment of Key Performance Indicators Used in the Oil and Gas Industry.
Int. J. Perform. Eng., 2020
Int. J. Perform. Eng., 2020
Using Cost-Effectiveness Acceptability Curves as a Basis for Prioritizing Investments in Safety Measures in the Offshore Oil and Gas Industry.
Int. J. Perform. Eng., 2020
2019
On the use of the vision zero principle and the ALARP principle for production loss in the oil and gas industry.
Reliab. Eng. Syst. Saf., 2019
A semi-quantitative assessment process for improved use of the expected value of information measure in safety management.
Reliab. Eng. Syst. Saf., 2019
2018
Using the ALARP principle for safety management in the energy production sector of chemical industry.
Reliab. Eng. Syst. Saf., 2018
2017
Reliab. Eng. Syst. Saf., 2017
2011
Reliab. Eng. Syst. Saf., 2011