Johnny C. Ho

Orcid: 0000-0002-8790-7769

According to our database1, Johnny C. Ho authored at least 18 papers between 1994 and 2022.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2022
Participative and Practical Goal-setting in Enterprise Systems Learning.
J. Comput. Inf. Syst., September, 2022

2020
Self-Assembly of Colloidal Particles for Fabrication of Structural Color Materials toward Advanced Intelligent Systems.
Adv. Intell. Syst., 2020

2019
A note on posterior tight worst-case bounds for longest processing time schedules.
4OR, 2019

The Role of Participative and Practical Goal-Setting in MIS Students Learning and Performance.
Proceedings of the 2019 on Computers and People Research Conference, 2019

2012
The impacts of technology evolution on market structure for green products.
Math. Comput. Model., 2012

A new heuristic for workload balancing on identical parallel machines and a statistical perspective on the workload balancing criteria.
Comput. Oper. Res., 2012

2011
Minimizing total weighted flowtime subject to minimum makespan on two identical parallel machines.
J. Intell. Manuf., 2011

2010
Parallel machine scheduling problems considering regular measures of performance and machine cost.
J. Oper. Res. Soc., 2010

Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility.
Comput. Oper. Res., 2010

2009
Minimizing the normalized sum of square for workload deviations on m parallel processors.
Comput. Ind. Eng., 2009

2007
Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs.
Eur. J. Oper. Res., 2007

An evaluation of lot-sizing heuristics for deteriorating inventory in material requirements planning systems.
Comput. Oper. Res., 2007

2006
Two modifications of the least cost per period heuristic for dynamic lot-sizing.
J. Oper. Res. Soc., 2006

2001
Minimizing makespan subject to minimum flowtime on two identical parallel machines.
Comput. Oper. Res., 2001

2000
Bicriteria optimisation of the makespan and mean flowtime on two identical parallel machines.
J. Oper. Res. Soc., 2000

1997
Single machine hierarchical scheduling with customer orders and multiple job classes.
Ann. Oper. Res., 1997

1995
Flowshop scheduling with dominant machines.
Comput. Oper. Res., 1995

1994
Uncertainty and the acquisition of capacity: A competitive analysis.
Comput. Oper. Res., 1994


  Loading...