John Paris Pantouvakis

Orcid: 0000-0001-6584-8166

According to our database1, John Paris Pantouvakis authored at least 8 papers between 1990 and 2017.

Collaborative distances:
  • Dijkstra number2 of six.
  • Erdős number3 of six.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2017
How can IPMA contribute to new PM2 EU commission standard?
Proceedings of the 2017 12th International Scientific and Technical Conference on Computer Sciences and Information Technologies (CSIT), Lviv, Ukraine, September 5-8, 2017, 2017

2014
An Integrated Information System for Monitoring Construction Works.
Int. J. Inf. Technol. Proj. Manag., 2014

A Computer-Aided Conceptual Cost Estimating System for Pre-Stressed Concrete Road Bridges.
Int. J. Inf. Technol. Proj. Manag., 2014

2007
compromise programming model in site selection for construction temporary facilities.
Oper. Res., 2007

2006
Road tunnel early cost estimates using multiple regression analysis.
Oper. Res., 2006

A practical approach to resource - constrained project scheduling.
Oper. Res., 2006

Editorial.
Oper. Res., 2006

1990
Declarative - configurable estimating systems for the construction industry.
PhD thesis, 1990


  Loading...