Jirachai Buddhakulsomsiri
Orcid: 0000-0003-1028-0950
According to our database1,
Jirachai Buddhakulsomsiri
authored at least 16 papers
between 2006 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on orcid.org
On csauthors.net:
Bibliography
2024
Int. J. Knowl. Syst. Sci., 2024
A mathematical model for the integrated problem of production network design and inventory positioning.
Comput. Ind. Eng., 2024
2022
Determining (s, S) Inventory Policy for Healthcare System: A Case Study of a Hospital in Thailand.
Int. J. Knowl. Syst. Sci., January, 2022
Int. Trans. Oper. Res., 2022
A Markovian approach to modeling a periodic order-up-to-level policy under stochastic discrete demand and lead time with lost sales.
Int. Trans. Oper. Res., 2022
Comput. Ind. Eng., 2022
IEEE Access, 2022
2020
Proceedings of the Integrated Uncertainty in Knowledge Modelling and Decision Making, 2020
2019
Measure of bullwhip effect in supply chain with price-sensitive and correlated demand.
Comput. Ind. Eng., 2019
Proceedings of the 2019 IEEE International Conference on Industrial Engineering and Engineering Management, 2019
2018
Prediction models of starch content in fresh cassava roots for a tapioca starch manufacturer in Thailand.
Comput. Electron. Agric., 2018
2015
Corrigendum to 'Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting' and 'Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting' [Eur. J. Oper. Res 175 (2006) 279-295, 178 (2007) 374-390].
Eur. J. Oper. Res., 2015
2012
A study of replacement rules for a parallel fleet replacement problem based on user preference utilization pattern and alternative fuel considerations.
Comput. Ind. Eng., 2012
2009
Comput. Ind. Eng., 2009
2007
Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting.
Eur. J. Oper. Res., 2007
2006
Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting.
Eur. J. Oper. Res., 2006