Jihong Pang

Orcid: 0000-0001-9802-4489

According to our database1, Jihong Pang authored at least 14 papers between 2011 and 2024.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
Energy consumption forecasting for laser manufacturing of large artifacts based on fusionable transfer learning.
Vis. Comput. Ind. Biomed. Art, December, 2024

A reliability analysis method for electromagnet performance degradation based on FMEA and fuzzy inference system.
Qual. Reliab. Eng. Int., November, 2024

An Intelligent Evaluation Method of Supply-Demand Matching Degree Based on ELECTRE III and VIKOR in Cloud Manufacturing Platform.
IEEE Access, 2024

2023
An Intelligent Control Model Based on Digital Twin Technology and Optimized Least-Squares Support Vector Regression for Predicting Electromagnetic Brake Assembly Quality.
IEEE Access, 2023

2022
A New Dynamic Fault Tree Analysis Method of Electromagnetic Brakes Based on Bayesian Network Accompanying Wiener Process.
Symmetry, 2022

Failure Evaluation of Electronic Products Based on Double Hierarchy Hesitant Fuzzy Linguistic Term Set and K-Means Clustering Algorithm.
Symmetry, 2022

2021
Product reliability analysis based on heavily censored interval data with batch effects.
Reliab. Eng. Syst. Saf., 2021

A new intelligent and data-driven product quality control system of industrial valve manufacturing process in CPS.
Comput. Commun., 2021

Feature-Extraction-Based Iterated Algorithms to Solve the Unrelated Parallel Machine Problem With Periodic Maintenance Activities.
IEEE Access, 2021

2019
Modeling and Scheduling for the Clean Operation of Semiconductor Manufacturing.
Proceedings of the Artificial Intelligence Algorithms and Applications, 2019

2018
A modified particle swarm optimization algorithm for a batch-processing machine scheduling problem with arbitrary release times and non-identical job sizes.
Comput. Ind. Eng., 2018

A scatter simulated annealing algorithm for the bi-objective scheduling problem for the wet station of semiconductor manufacturing.
Comput. Ind. Eng., 2018

2011
ELECTRE I Decision Model of Reliability Design Scheme for Computer Numerical Control Machine.
J. Softw., 2011

Study on Operating Mechanisms and Dynamics Behavior of Agile Supply Chain.
J. Softw., 2011


  Loading...