Jian Lin
Orcid: 0000-0003-1265-5314Affiliations:
- Zhejiang University of Finance and Economics, School of Information, Hangzhou, China
According to our database1,
Jian Lin
authored at least 26 papers
between 2009 and 2025.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on orcid.org
On csauthors.net:
Bibliography
2025
An effective two-stage heuristic for scheduling the distributed assembly flowshops with sequence dependent setup times.
Comput. Oper. Res., 2025
2023
An effective hyper heuristic-based memetic algorithm for the distributed assembly permutation flow-shop scheduling problem.
Appl. Soft Comput., March, 2023
2022
Expert Syst. Appl., 2022
Multi-skill resource constrained project scheduling using a multi-objective discrete Jaya algorithm.
Appl. Intell., 2022
2021
A genetic programming hyper-heuristic for the distributed assembly permutation flow-shop scheduling problem with sequence dependent setup times.
Swarm Evol. Comput., 2021
A decomposition-based multi-objective genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem.
Knowl. Based Syst., 2021
A utility-aware multi-task scheduling method in cloud manufacturing using extended NSGA-II embedded with game theory.
Int. J. Comput. Integr. Manuf., 2021
2020
And-like-uninorm based consistency analysis and optimized fuzzy weight closed-form solution of triangular fuzzy additive preference relations.
Inf. Sci., 2020
A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem.
Expert Syst. Appl., 2020
Solving Flexible Job-shop Problem with Sequence-dependent Setup Times by Using Selection Hyper-heuristics.
Proceedings of the AIAM2020: 2nd International Conference on Artificial Intelligence and Advanced Manufacture, 2020
2019
Collaborative vehicle routing problem with rough location using extended ant colony optimization algorithm.
J. Intell. Fuzzy Syst., 2019
Axiomatic property based consistency analysis and decision making with interval multiplicative reciprocal preference relations.
Inf. Sci., 2019
Consistency and optimized priority weight analytical solutions of interval multiplicative preference relations.
Inf. Sci., 2019
Backtracking search based hyper-heuristic for the flexible job-shop scheduling problem with fuzzy processing time.
Eng. Appl. Artif. Intell., 2019
A goal programming based heuristic method to obtaining interval weights in analytic form from interval multiplicative comparison matrices.
Comput. Ind. Eng., 2019
A hybrid multi-verse optimization for the fuzzy flexible job-shop scheduling problem.
Comput. Ind. Eng., 2019
A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem.
Appl. Soft Comput., 2019
2017
A backtracking search hyper-heuristic for the distributed assembly flow-shop scheduling problem.
Swarm Evol. Comput., 2017
Acceptability measurement and priority weight elicitation of triangular fuzzy multiplicative preference relations based on geometric consistency and uncertainty indices.
Inf. Sci., 2017
Differential Evolution Based Hyper-heuristic for the Flexible Job-Shop Scheduling Problem with Fuzzy Processing Time.
Proceedings of the Simulated Evolution and Learning - 11th International Conference, 2017
2016
Circuits Syst. Signal Process., 2016
An effective hybrid biogeography-based optimization algorithm for the distributed assembly permutation flow-shop scheduling problem.
Comput. Ind. Eng., 2016
Ratio-based similarity analysis and consensus building for group decision making with interval reciprocal preference relations.
Appl. Soft Comput., 2016
2015
A hybrid biogeography-based optimization for the fuzzy flexible job-shop scheduling problem.
Knowl. Based Syst., 2015
2009
Proceedings of the Advances in Neural Networks, 2009
Proceedings of the Fifth International Conference on Natural Computation, 2009