Jean-Marie Proth

According to our database1, Jean-Marie Proth authored at least 46 papers between 1986 and 2013.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2013
Assembly Line Balancing: Conventional Methods and Extensions.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

2012
Guest Editorial Special Section on Radio Frequency Identification.
IEEE Trans. Ind. Informatics, 2012

2011
Centralized fleet management system for cybernetic transportation.
Expert Syst. Appl., 2011

2010
Algorithms for partitioning of large routing networks.
J. Oper. Res. Soc., 2010

Pricing strategies and models.
Annu. Rev. Control., 2010

2009
A Data Mining Approach for Adaptive Path Planning on Large Road Networks.
Proceedings of the Foundations of Computational Intelligence - Volume 6: Data Mining, 2009

Minimizing the number of machines for minimum length schedules.
Eur. J. Oper. Res., 2009

The one machine scheduling problem: Insertion of a job under the real-time constraint.
Eur. J. Oper. Res., 2009

2008
Optimisation of multi-position machines and transfer lines.
Eur. J. Oper. Res., 2008

2007
Scheduling in supply chain environment.
Eur. J. Oper. Res., 2007

Scheduling: New trends in industrial environment.
Annu. Rev. Control., 2007

2006
Opportunistic supply chain formation from qualified partners for a new market demand.
J. Oper. Res. Soc., 2006

2005
Insertion of a random task in a schedule: a real-time approach.
Eur. J. Oper. Res., 2005

2004
Scheduling with Due Date Assignment.
Proceedings of the Handbook of Scheduling - Algorithms, Models, and Performance Analysis., 2004

The 0-1 outcomes feature selection problem: a χ<sup>2</sup> approach.
J. Intell. Manuf., 2004

Insertion of a random bitask in a schedule: a real-time approach.
Comput. Oper. Res., 2004

2003
Optimization of cyclic production systems: a heuristic approach.
IEEE Trans. Robotics Autom., 2003

The concave cost supply problem.
Eur. J. Oper. Res., 2003

Simulation system for estimating travel time in a network.
Proceedings of the IEEE International Conference on Systems, 2003

2002
Multifunction Radar: Task Scheduling.
J. Math. Model. Algorithms, 2002

A survey of the state-of-the-art of common due date assignment and scheduling research.
Eur. J. Oper. Res., 2002

2001
Scheduling no-wait production with time windows and flexible processing times.
IEEE Trans. Robotics Autom., 2001

Scheduling with common due date assignment.
Proceedings of 8th IEEE International Conference on Emerging Technologies and Factory Automation, 2001

Supply management with concave cost.
Proceedings of 8th IEEE International Conference on Emerging Technologies and Factory Automation, 2001

2000
On-line scheduling in a surface treatment system.
Eur. J. Oper. Res., 2000

1999
The cutting stock problem with mixed objectives: Two heuristics based on dynamic programming.
Eur. J. Oper. Res., 1999

Parallel Machine Scheduling with Common Due Date.
Proceedings of the 17th IASTED International Conference on Applied Informatics, 1999

1998
An improvement of the Lagrangean relaxation approach for job shop scheduling: a dynamic programming method.
IEEE Trans. Robotics Autom., 1998

Cyclic scheduling of a hoist with time window constraints.
IEEE Trans. Robotics Autom., 1998

Scheduling of piecewise constant product flows: A Petri net approach.
Eur. J. Oper. Res., 1998

1997
A class of Petri nets for manufacturing system integration.
IEEE Trans. Robotics Autom., 1997

Optimization of the number of transportation devices in a flexible manufacturing system using event graphs.
IEEE Trans. Ind. Electron., 1997

Supply management for cost minimization in assembly systems with random component yield times.
J. Intell. Manuf., 1997

Editorial.
J. Intell. Manuf., 1997

Management of a pool of self-service cars.
J. Intell. Manuf., 1997

Petri nets for modelling and evaluating deterministic and stochastic manufacturing systems.
Proceedings of the Seventh International Workshop on Petri Nets and Performance Models, 1997

1996
Single machine scheduling with chain: structured precedence constraints and separation time windows.
IEEE Trans. Robotics Autom., 1996

Marking optimization of stochastic timed event graphs using IPA.
Discret. Event Dyn. Syst., 1996

1995
A More Efficient lagrangian Relaxation Approach to Job-Shop Scheduling Problems.
Proceedings of the 1995 International Conference on Robotics and Automation, 1995

1994
Cycle time of stochastic event graphs: evaluation and marking optimization.
IEEE Trans. Autom. Control., 1994

1992
COALA: A Manufacturing Plant Layout Approach.
Proceedings of the Human Aspects in Computer Integrated Manufacturing, 1992

1991
Marking Optimization In Timed Event Graphs.
Proceedings of the Advances in Petri Nets 1993, 1991

1990
Manufacturing cell design using simulated annealing: An industrial application.
J. Intell. Manuf., 1990

Existence of Forecast Horizons in Undiscounted Discrete-Time Lot Size Models.
Oper. Res., 1990

Evaluation of jobshops with random manufacturing times: a Petri net approach.
Proceedings of the 1990 IEEE International Conference on Robotics and Automation, 1990

1986
Group technology in production management: A tool to simplify some scheduling problems.
Proceedings of the 1986 IEEE International Conference on Robotics and Automation, 1986


  Loading...