Javad Barabady
According to our database1,
Javad Barabady
authored at least 15 papers
between 2008 and 2019.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2019
Reliability and Maintainability Analysis of Material Handling Machinery in Golegohar Mine No. 1.
Proceedings of the 4th International Conference on System Reliability and Safety, 2019
2016
On RAM performance of production facilities operating under the Barents Sea harsh environmental conditions.
Int. J. Syst. Assur. Eng. Manag., 2016
An expert-based approach to production performance analysis of oil and gas facilities considering time-independent Arctic operating conditions.
Int. J. Syst. Assur. Eng. Manag., 2016
Int. J. Syst. Assur. Eng. Manag., 2016
2015
Performance-based aggregation of expert opinions for reliability prediction of Arctic offshore facilities.
Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, 2015
Performance-based risk management systems (PBRMS) in the Arctic drilling waste handling operation.
Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, 2015
2014
Application of reliability models with covariates in spare part prediction and optimization - A case study.
Reliab. Eng. Syst. Saf., 2014
Effectiveness assessment for waste management decision-support in the Arctic drilling.
Proceedings of the 2014 IEEE International Conference on Industrial Engineering and Engineering Management, 2014
2011
A methodology for throughput capacity analysis of a production facility considering environment condition.
Reliab. Eng. Syst. Saf., 2011
Reliab. Eng. Syst. Saf., 2011
2010
Int. J. Syst. Assur. Eng. Manag., 2010
A framework for improvement of production plant performance using production assurance programs.
Int. J. Syst. Assur. Eng. Manag., 2010
An approach for prediction of petroleum production facility performance considering Arctic influence factors.
Reliab. Eng. Syst. Saf., 2010
2008
Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran.
Reliab. Eng. Syst. Saf., 2008