James C. Hershauer

According to our database1, James C. Hershauer authored at least 7 papers between 1971 and 2002.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2002
CEPM 3: lead time reduction via pre-positioning of inventory in an industrial construction supply chain.
Proceedings of the 34th Winter Simulation Conference: Exploring New Frontiers, 2002

CEPM 3: contributors to lead time in construction supply chains: case of pipe supports used in power plants.
Proceedings of the 34th Winter Simulation Conference: Exploring New Frontiers, 2002

1999
A software reuse measure: Monitoring an enterprise-level model driven development process.
Inf. Manag., 1999

1997
Coordination Cost Evaluation of Network Configurations.
J. Organ. Comput. Electron. Commer., 1997

1989
A field observation study of an expert system prototype development.
Inf. Manag., 1989

1973
A directed search approach to selecting a sequencing rule.
Proceedings of the 6th conference on Winter simulation, 1973

1971
An empirically based-investigation of job-shop sequencing.
Proceedings of the 5th conference on Winter simulation, 1971


  Loading...