Irem Otay
Orcid: 0000-0001-5895-506X
According to our database1,
Irem Otay
authored at least 18 papers
between 2014 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on orcid.org
On csauthors.net:
Bibliography
2024
Evaluation of sustainable energy systems in smart cities using a Multi-Expert Pythagorean fuzzy BWM & TOPSIS methodology.
Expert Syst. Appl., 2024
2023
A novel interval valued circular intuitionistic fuzzy AHP methodology: Application in digital transformation project selection.
Inf. Sci., November, 2023
Tech-center location selection by interval-valued spherical fuzzy AHP based MULTIMOORA methodology.
Soft Comput., August, 2023
2021
An Integrated Fuzzy Multi-Criteria Approach for E-Waste Collection Center Location Problem.
Int. J. Fuzzy Syst. Appl., 2021
2020
A novel pythagorean fuzzy AHP and TOPSIS method for the wind power farm location selection problem.
J. Intell. Fuzzy Syst., 2020
Multi-expert disaster risk management & response capabilities assessment using interval-valued intuitionistic fuzzy sets.
J. Intell. Fuzzy Syst., 2020
2018
J. Enterp. Inf. Manag., 2018
2017
Multi-expert performance evaluation of healthcare institutions using an integrated intuitionistic fuzzy AHP&DEA methodology.
Knowl. Based Syst., 2017
Proceedings of the Advances in Fuzzy Logic and Technology 2017 - Proceedings of: EUSFLAT-2017 - The 10th Conference of the European Society for Fuzzy Logic and Technology, September 11-15, 2017, Warsaw, Poland IWIFSGN'2017, 2017
2016
Proceedings of the Fuzzy Logic in Its 50th Year, 2016
Multicriteria Bottle Design in the Beverage Industry Using Interval-Valued Intuitionistic Fuzzy Sets.
J. Multiple Valued Log. Soft Comput., 2016
A two-stage fuzzy approach for supplier evaluation and order allocation problem with quantity discounts and lead time.
Inf. Sci., 2016
A multiobjective fuzzy mathematical model for a supply chain problem with the forward and reverse flows.
Int. J. Inf. Decis. Sci., 2016
2015
Proceedings of the Intelligent Techniques in Engineering Management, 2015
Multi-Criteria and Multi-Stage Facility Location Selection under Interval Type-2 Fuzzy Environment: A Case Study for a Cement Factory.
Int. J. Comput. Intell. Syst., 2015
A fuzzy multi-objective model for solving project network problem with bonus and incremental penalty cost.
Comput. Ind. Eng., 2015
Worldwide Investing in Real Estate Using Interval-Valued Intuitionistic Fuzzy Sets.
Proceedings of the 2015 Conference of the International Fuzzy Systems Association and the European Society for Fuzzy Logic and Technology (IFSA-EUSFLAT-15), 2015
2014