Ilhem Slama

According to our database1, Ilhem Slama authored at least 12 papers between 2020 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
An overview on human-centred technologies, measurements and optimisation in assembly systems.
Int. J. Prod. Res., 2024

Simultaneous Backward Reduction algorithm for disassembly lot-sizing under random ordering lead time.
Proceedings of the 10th International Conference on Control, 2024

Bi-Objective Multi-Period Multi-Sourcing Supply Planning with Stochastic Lead-Times, Degressive Pricing, and Carbon Footprint<sup>*</sup>.
Proceedings of the 10th International Conference on Control, 2024

Supplier Selection Considering Flexibility, Order Splitting, and Uncertainty of lead times.
Proceedings of the 10th International Conference on Control, 2024

2023
Advancing human-robot interaction in a manufacturing environment by incorporating hand movements for remote control.
Proceedings of the IEEE International Conference on Networking, Sensing and Control, 2023

Two-stage Stochastic Program for Capacitated Disassembly Lot-sizing Under Random Yield.
Proceedings of the IEEE International Conference on Networking, Sensing and Control, 2023

Assembly Line Balancing with Collaborative Robots Under Uncertainty of Human Processing Times.
Proceedings of the 9th International Conference on Control, 2023

2022
Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times.
Eur. J. Oper. Res., 2022

2021
Genetic algorithm and Monte Carlo simulation for a stochastic capacitated disassembly lot-sizing problem under random lead times.
Comput. Ind. Eng., 2021

A Model for a Multi-level Disassembly System Under Random Disassembly Lead Times.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

2020
Modélisation et optimisation de problème de planification de désassemblage dans un environnement incertain. (Modeling and optimization of the disassembly planning problem under uncertainty).
PhD thesis, 2020

A Stochastic Model for a Two-Level Disassembly Lot-Sizing Problem Under Random Lead Time.
Proceedings of the Advances in Production Management Systems. The Path to Digital Transformation and Innovation of Production Management Systems, 2020


  Loading...