Hyoungkwan Kim

According to our database1, Hyoungkwan Kim authored at least 18 papers between 2008 and 2022.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2022
Conditional Generative Adversarial Networks with Adversarial Attack and Defense for Generative Data Augmentation.
J. Comput. Civ. Eng., 2022

2021
Computer Vision-Based Estimation of Flood Depth in Flooded-Vehicle Images.
J. Comput. Civ. Eng., 2021

Proactive proximity monitoring with instance segmentation and unmanned aerial vehicle-acquired video-frame prediction.
Comput. Aided Civ. Infrastructure Eng., 2021

2019
Patch-Based Crack Detection in Black Box Images Using Convolutional Neural Networks.
J. Comput. Civ. Eng., 2019

Data Augmentation Using Adversarial Training for Construction-Equipment Classification.
CoRR, 2019

Encoder-decoder network for pixel-level road crack detection in black-box images.
Comput. Aided Civ. Infrastructure Eng., 2019

2018
Detecting Construction Equipment Using a Region-Based Fully Convolutional Network and Transfer Learning.
J. Comput. Civ. Eng., 2018

2016
Vision-Based Object-Centric Safety Assessment Using Fuzzy Inference: Monitoring Struck-By Accidents with Moving Objects.
J. Comput. Civ. Eng., 2016

2015
Computer vision techniques for construction safety and health monitoring.
Adv. Eng. Informatics, 2015

2013
Error-Correction Methods for Construction Site Image Processing under Changing Illumination Conditions.
J. Comput. Civ. Eng., 2013

2012
Interactive Modeler for Construction Equipment Operation Using Augmented Reality.
J. Comput. Civ. Eng., 2012

RFID and CCTV-Based Material Delivery Monitoring for Cable-Stayed Bridge Construction.
J. Comput. Civ. Eng., 2012

2011
3D/4D CAD Applicability for Life-Cycle Facility Management.
J. Comput. Civ. Eng., 2011

Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project.
J. Comput. Civ. Eng., 2011

2010
Object Recognition in Construction-Site Images Using 3D CAD-Based Filtering.
J. Comput. Civ. Eng., 2010

2009
Analyzing Schedule Delay of Mega Project: Lessons Learned From Korea Train Express.
IEEE Trans. Engineering Management, 2009

Structuring the prediction model of project performance for international construction projects: A comparative analysis.
Expert Syst. Appl., 2009

2008
Decision support in construction equipment management using a nonparametric outlier mining algorithm.
Expert Syst. Appl., 2008


  Loading...