Hamdi A. Bashir
According to our database1,
Hamdi A. Bashir
authored at least 14 papers
between 2001 and 2023.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2023
Proceedings of the IEEE International Conference on Service Operations and Logistics, 2023
A Literature-Based Comprehensive Model for Factors Affecting Firm Productivity in the Service Sector.
Proceedings of the IEEE International Conference on Service Operations and Logistics, 2023
2021
Monitoring scheme for early detection of coronavirus and other respiratory virus outbreaks.
Comput. Ind. Eng., 2021
A Hierarchical Graphical Model of Critical Success Factors for Implementing the UAE's Government Excellence.
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2021
2020
Modeling and analyzing project interdependencies in project portfolios using an integrated social network analysis-fuzzy TOPSIS MICMAC approach.
Int. J. Syst. Assur. Eng. Manag., 2020
Modelling and analyzing of critical success factors for implementing UAE's Government Excellence Model in the public sector: an ISM and Fuzzy-MICMAC approach.
Int. J. Syst. Assur. Eng. Manag., 2020
An exploratory study of common issues and key differences between the European Foundation for Quality Management and the United Arab Emirates Public Sector Excellence Model: public sector organisation results.
Int. J. Syst. Assur. Eng. Manag., 2020
An integrated ISM fuzzy MICMAC approach for modeling and analyzing electrical power system network interdependencies.
Int. J. Syst. Assur. Eng. Manag., 2020
2014
Int. J. Inf. Technol. Proj. Manag., 2014
2009
An Eigenvalue Based Approach for Assessing the Decomposability of Interdependent Design Project Tasks.
Concurr. Eng. Res. Appl., 2009
2007
Testing the Feasibility of Adapting Cellular Manufacturing in an Early Stage of Design.
Proceedings of the International MultiConference of Engineers and Computer Scientists 2007, 2007
2005
Comput. Ind. Eng., 2005
2004
2001
Project Estimation from Feasibility Study until Completion: A Quantitative Methodology.
Concurr. Eng. Res. Appl., 2001