Hamdi A. Bashir

According to our database1, Hamdi A. Bashir authored at least 14 papers between 2001 and 2023.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2023
Factor Analysis-Based Method for Clustering Taxi Zones.
Proceedings of the IEEE International Conference on Service Operations and Logistics, 2023

A Literature-Based Comprehensive Model for Factors Affecting Firm Productivity in the Service Sector.
Proceedings of the IEEE International Conference on Service Operations and Logistics, 2023

2021
Monitoring scheme for early detection of coronavirus and other respiratory virus outbreaks.
Comput. Ind. Eng., 2021

A Hierarchical Graphical Model of Critical Success Factors for Implementing the UAE's Government Excellence.
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2021

2020
Modeling and analyzing project interdependencies in project portfolios using an integrated social network analysis-fuzzy TOPSIS MICMAC approach.
Int. J. Syst. Assur. Eng. Manag., 2020

Modelling and analyzing of critical success factors for implementing UAE's Government Excellence Model in the public sector: an ISM and Fuzzy-MICMAC approach.
Int. J. Syst. Assur. Eng. Manag., 2020

An exploratory study of common issues and key differences between the European Foundation for Quality Management and the United Arab Emirates Public Sector Excellence Model: public sector organisation results.
Int. J. Syst. Assur. Eng. Manag., 2020

An integrated ISM fuzzy MICMAC approach for modeling and analyzing electrical power system network interdependencies.
Int. J. Syst. Assur. Eng. Manag., 2020

2014
Factors Causing Project Cost Overrun in the Telecommunications Industry in Oman.
Int. J. Inf. Technol. Proj. Manag., 2014

2009
An Eigenvalue Based Approach for Assessing the Decomposability of Interdependent Design Project Tasks.
Concurr. Eng. Res. Appl., 2009

2007
Testing the Feasibility of Adapting Cellular Manufacturing in an Early Stage of Design.
Proceedings of the International MultiConference of Engineers and Computer Scientists 2007, 2007

2005
A mathematical approach for the formation of manufacturing cells.
Comput. Ind. Eng., 2005

2004
Estimating design effort for GE hydro projects.
Comput. Ind. Eng., 2004

2001
Project Estimation from Feasibility Study until Completion: A Quantitative Methodology.
Concurr. Eng. Res. Appl., 2001


  Loading...