Hadi Mokhtari

Orcid: 0000-0002-5297-5841

According to our database1, Hadi Mokhtari authored at least 28 papers between 2011 and 2022.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2022
Optimal lot-sizing under learning effect in inspection errors with different types of imperfect quality items.
Oper. Res., 2022

2020
A single-supplier, multi-buyer, multi-product VMI production-inventory system under partial backordering.
Oper. Res., 2020

2019
A redundancy allocation problem by using utility function method and ant colony optimization: tradeoff between availability and total cost.
Int. J. Syst. Assur. Eng. Manag., 2019

2018
A statistical analysis and simulation based approach to an uncertain supplier selection problem with discount option.
Int. J. Syst. Assur. Eng. Manag., 2018

A hybrid advertising media selection model using AHP and fuzzy-based GA decision making.
Neural Comput. Appl., 2018

Economic order quantity for joint complementary and substitutable items.
Math. Comput. Simul., 2018

An efficient chaotic based PSO for earliness/tardiness optimization in a batch processing flow shop scheduling problem.
J. Intell. Manuf., 2018

A multi-objective optimization for brush monofilament tufting process design.
J. Comput. Des. Eng., 2018

2017
An interactive preference decision making approach to multi-response process design with location and dispersion effects.
Int. J. Inf. Decis. Sci., 2017

A fuzzy multi-objective goal programming model for solving an aggregate production planning problem with uncertainty.
Int. J. Inf. Decis. Sci., 2017

Solving a multi-objective redundancy allocation problem under opportunistic maintenance strategy.
Int. J. Data Anal. Tech. Strateg., 2017

An energy-efficient multi-objective optimization for flexible job-shop scheduling problem.
Comput. Chem. Eng., 2017

2016
Research on group search optimizers for a reconfigurable flow shop sequencing problem.
Neural Comput. Appl., 2016

Manufacturing operations outsourcing through an artificial team process algorithm.
J. Intell. Fuzzy Syst., 2016

A robust modelling and optimisation framework for a batch processing flow shop production system in the presence of uncertainties.
Int. J. Comput. Integr. Manuf., 2016

Comparison of particle swarm optimization and simulated annealing for locating additional boreholes considering combined variance minimization.
Comput. Geosci., 2016

2015
Scheduling of printed circuit board (PCB) assembly systems with heterogeneous processors using simulation-based intelligent optimization methods.
Neural Comput. Appl., 2015

Designing an efficient bi-criteria iterated greedy heuristic for simultaneous order scheduling and resource allocation: a balance between cost and lateness measures.
Neural Comput. Appl., 2015

An Evolutionary Clustering-Based Optimization to Minimize Total Weighted Completion Time Variance in a Multiple Machine Manufacturing System.
Int. J. Inf. Technol. Decis. Mak., 2015

Robust supplier selection in a closed loop supply chain using a hybrid approach based on design of experiments and simulation.
Int. J. Appl. Decis. Sci., 2015

A Monte Carlo simulation based chaotic differential evolution algorithm for scheduling a stochastic parallel processor system.
Expert Syst. Appl., 2015

Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate.
Comput. Oper. Res., 2015

A nature inspired intelligent water drops evolutionary algorithm for parallel processor scheduling with rejection.
Appl. Soft Comput., 2015

2013
Research on computational intelligence algorithms with adaptive learning approach for scheduling problems with batch processing machines.
Neurocomputing, 2013

A robust posterior preference decision-making approach to multiple response process design.
Int. J. Appl. Decis. Sci., 2013

Scheduling with an outsourcing option on both manufacturer and subcontractors.
Comput. Oper. Res., 2013

2011
Time-Cost Tradeoff Analysis in Project Management: An Ant System Approach.
IEEE Trans. Engineering Management, 2011

Production capacity planning and scheduling in a no-wait environment with controllable processing times: An integrated modeling approach.
Expert Syst. Appl., 2011


  Loading...