Gündüz Ulusoy

According to our database1, Gündüz Ulusoy authored at least 16 papers between 1995 and 2019.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2019
Resource portfolio problem under relaxed resource dedication policy in multi-mode multi-project scheduling.
Int. J. Math. Oper. Res., 2019

2015
Multi-mode resource constrained multi-project scheduling and resource portfolio problem.
Eur. J. Oper. Res., 2015

2014
Multi-project scheduling with two-stage decomposition.
Ann. Oper. Res., 2014

Dynamic Resource Constrained Multi-Project Scheduling Problem with Weighted Earliness/Tardiness Costs.
Proceedings of the Essays in Production, 2014

2012
Preface.
Optim. Lett., 2012

Business Strategy and Innovativeness: Results from an Empirical Study.
Proceedings of the Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, 2012

2004
Multiprocessor task scheduling in multistage hybrid flow-shops: a genetic algorithm approach.
J. Oper. Res. Soc., 2004

2001
Four Payment Models for the Multi-Mode Resource Constrained Project Scheduling Problem with Discounted Cash Flows.
Ann. Oper. Res., 2001

Preface.
Ann. Oper. Res., 2001

2000
Sixth International Workshop on Project Management and Scheduling.
Eur. J. Oper. Res., 2000

An equitable approach to the payment scheduling problem in project management.
Eur. J. Oper. Res., 2000

1999
Parallel machine scheduling with earliness and tardiness penalties.
Comput. Oper. Res., 1999

1998
A bicriteria two-machine permutation flowshop problem.
Eur. J. Oper. Res., 1998

1997
Letter to the Editor.
Oper. Res., 1997

A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles.
Comput. Oper. Res., 1997

1995
A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS.
Oper. Res., 1995


  Loading...