Gudrun P. Kiesmüller
Orcid: 0000-0002-3796-9224
According to our database1,
Gudrun P. Kiesmüller
authored at least 31 papers
between 2003 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on mgt.tum.de
On csauthors.net:
Bibliography
2024
Hybrid Value Function Approximation for Solving the Technician Routing Problem with Stochastic Repair Requests.
Transp. Sci., 2024
2023
Central Eur. J. Oper. Res., March, 2023
Eur. J. Oper. Res., 2023
Eur. J. Oper. Res., 2023
2022
Inventory management with advance demand information and flexible shipment consolidation.
OR Spectr., 2022
Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning.
Eur. J. Oper. Res., 2022
Multiperiod integrated spare parts and tour planning for on-site maintenance activities with stochastic repair requests.
Comput. Oper. Res., 2022
2020
Eur. J. Oper. Res., 2020
Controlling distribution inventory systems with shipment consolidation and compound Poisson demand.
Eur. J. Oper. Res., 2020
2018
Publisher Correction: Approaches for periodic inventory control under random production yield and fixed setup cost.
OR Spectr., 2018
Approaches for periodic inventory control under random production yield and fixed setup cost.
OR Spectr., 2018
Eur. J. Oper. Res., 2018
Optimal and heuristic policies for assemble-to-order systems with different review periods.
Eur. J. Oper. Res., 2018
2016
2015
On the upgrading policy after the redesign of a component for reliability improvement.
Eur. J. Oper. Res., 2015
Exact and heuristic linear-inflation policies for an inventory model with random yield and arbitrary lead times.
Eur. J. Oper. Res., 2015
Evaluation of the expected makespan of a set of non-resumable jobs on parallel machines with stochastic failures.
Eur. J. Oper. Res., 2015
Ann. Oper. Res., 2015
2014
OR Spectr., 2014
2013
Eur. J. Oper. Res., 2013
Eur. J. Oper. Res., 2013
2011
2010
Eur. J. Oper. Res., 2010
Multi-item inventory control with full truckloads: A comparison of aggregate and individual order triggering.
Eur. J. Oper. Res., 2010
The benefit of VMI strategies in a stochastic multi-product serial two echelon system.
Comput. Oper. Res., 2010
2009
Oper. Res. Lett., 2009
2007
Developing a closed-form cost expression for an (R, s, nQ) policy where the demand process is compound generalized Erlang.
Oper. Res. Lett., 2007
2004
OR Spectr., 2004
2003
J. Oper. Res. Soc., 2003
Computational issues in a stochastic finite horizon one product recovery inventory model.
Eur. J. Oper. Res., 2003
A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes.
Eur. J. Oper. Res., 2003