Giovanni Celano

Orcid: 0000-0001-7871-7499

According to our database1, Giovanni Celano authored at least 30 papers between 2000 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Optimal designs of the omnibus SPRT control chart for joint monitoring of process mean and dispersion.
Int. J. Prod. Res., 2024

Distribution-free control charts for monitoring scale in finite horizon productions.
Eur. J. Oper. Res., 2024

2023
The Shewhart-type RZ control chart for monitoring the ratio of autocorrelated variables.
Int. J. Prod. Res., October, 2023

2022
A number-between-events control chart for monitoring finite horizon production processes.
Qual. Reliab. Eng. Int., 2022

A bootstrap method for the measurement error estimation in Gauge R & R $R{\&}R$ Studies.
Qual. Reliab. Eng. Int., 2022

2021
A distribution-free Shewhart-type Mann-Whitney control chart for monitoring finite horizon productions.
Int. J. Prod. Res., 2021

2020
On-line monitoring of extreme values of geometric profiles in finite horizon processes.
Qual. Reliab. Eng. Int., 2020

2018
Monitoring compositional data using multivariate exponentially weighted moving average scheme.
Qual. Reliab. Eng. Int., 2018

An EWMA sign control chart with varying control limits for finite horizon processes.
Qual. Reliab. Eng. Int., 2018

The Shewhart F control chart for monitoring processes with finite number of inspections.
Qual. Reliab. Eng. Int., 2018

2017
A variable sampling interval Shewhart control chart for monitoring the coefficient of variation in short production runs.
Int. J. Prod. Res., 2017

2016
Monitoring the Ratio of Two Normal Variables Using EWMA Type Control Charts.
Qual. Reliab. Eng. Int., 2016

A Synthetic Control Chart for Monitoring the Ratio of Two Normal Variables.
Qual. Reliab. Eng. Int., 2016

Design of a Phase II Control Chart for Monitoring the Ratio of two Normal Variables.
Qual. Reliab. Eng. Int., 2016

Joint Shewhart control charts for location and scale monitoring in finite horizon processes.
Comput. Ind. Eng., 2016

2014
Control Charts monitoring Product's Loss to Society.
Qual. Reliab. Eng. Int., 2014

Statistical Performance of a Control Chart for Individual Observations Monitoring the Ratio of Two Normal Variables.
Qual. Reliab. Eng. Int., 2014

2013
Monitoring the Coefficient of Variation Using a Variable Sampling Interval Control Chart.
Qual. Reliab. Eng. Int., 2013

Performance of t control charts in short runs with unknown shift sizes.
Comput. Ind. Eng., 2013

2012
The economic performance of the Shewhart <i>t</i> chart.
Qual. Reliab. Eng. Int., 2012

2011
Shewhart and EWMA <i>t</i> control charts for short production runs.
Qual. Reliab. Eng. Int., 2011

Flow Shop Group Scheduling with Limited Buffer Capacity and Different Workforce.
Proceedings of the ICINCO 2011 - Proceedings of the 8th International Conference on Informatics in Control, Automation and Robotics, Volume 2, Noordwijkerhout, The Netherlands, 28, 2011

2010
Economic design of inspection strategies to monitor dispersion in short production runs.
Comput. Ind. Eng., 2010

A new efficient encoding/decoding procedure for the design of a supply chain network with genetic algorithms.
Comput. Ind. Eng., 2010

2007
A variable sampling interval S<sup>2</sup>-EWMA control chart for monitoring the process variance.
Int. J. Technol. Manag., 2007

2004
Human factor policy testing in the sequencing of manual mixed model assembly lines.
Comput. Oper. Res., 2004

2003
An Evolutionary Algorithm for Pure Fuzzy Flowshop Scheduling Problems.
Int. J. Uncertain. Fuzziness Knowl. Based Syst., 2003

2002
Constrained scheduling of jobs with different due dates in a flowshop.
Proceedings of the IEEE International Conference on Systems, Man and Cybernetics, Yasmine Hammamet, Tunisia, October 6-9, 2002, 2002

2001
Fuzzy scheduling of a flexible assembly line through evolutionary algorithms.
Proceedings of the IEEE International Conference on Systems, 2001

2000
Fuzzy scheduling of a flexible assembly line through an evolutionary algorithm.
Proceedings of the IEEE International Conference on Systems, 2000


  Loading...