Georgios N. Aretoulis

Orcid: 0000-0002-9248-3454

According to our database1, Georgios N. Aretoulis authored at least 11 papers between 2006 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Radial Basis Function (RBF) and Multilayer Perceptron (MLP) Comparative Analysis on Building Renovation Cost Estimation: The Case of Greece.
Algorithms, September, 2024

2021
Evaluating Organizational Sustainability: A Multi-Criteria Based-Approach to Sustainable Project Management Indicators.
Syst., 2021

Required Project Designers' Attributes as Perceived by Male and Female Engineers.
Int. J. Decis. Support Syst. Technol., 2021

2020
PROMETHEE-based ranking of project managers based on the five personality traits.
Kybernetes, 2020

A Combination of PROMETHEE and Goal Programming Methods for the Evaluation of Water Airport Connections.
Int. J. Decis. Support Syst. Technol., 2020

2017
Neural Networks and Statistical Analysis for Time and Cost Prediction Models of Urban Redevelopment Projects.
Int. J. Inf. Syst. Soc. Chang., 2017

2015
Project Managers' Profile Influence on Design and Implementation of Cost Monitoring and Control Systems for Construction Projects.
Int. J. Inf. Technol. Proj. Manag., 2015

Selection of the most competent project designer based on multi-criteria and cluster analysis.
Int. J. Data Anal. Tech. Strateg., 2015

2014
Greek Construction Project Managers' Cognitive Abilities, Personality and Knowledge.
Int. J. Oper. Res. Inf. Syst., 2014

2010
Construction material supplier selection under multiple criteria.
Oper. Res., 2010

2006
A prototype system for the prediction of final cost in construction projects.
Oper. Res., 2006


  Loading...