George J. Kyparisis

Orcid: 0000-0003-2193-0613

According to our database1, George J. Kyparisis authored at least 44 papers between 1997 and 2024.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Erratum to "Competitive Two-Agent Scheduling and Its Applications".
Oper. Res., 2024

2023
Simultaneous minimisation of mean and variation of waiting times in a two-stage proportionate blocking flow shop.
J. Oper. Res. Soc., November, 2023

A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems.
Eur. J. Oper. Res., 2023

Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection.
Eur. J. Oper. Res., 2023

2022
Flow shop scheduling with two distinct job due dates.
Comput. Ind. Eng., 2022

2021
The no-wait flow shop with rejection.
Int. J. Prod. Res., 2021

2019
New results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectives.
Eur. J. Oper. Res., 2019

2018
Resale price maintenance in supply chains with general multiplicative demand.
Oper. Res. Lett., 2018

The price-setting newsvendor with nonlinear salvage revenue and shortage cost.
Oper. Res. Lett., 2018

Competition in two-tier serial and assembly supply chains with general consumer utility functions.
Int. J. Prod. Res., 2018

The price-setting newsvendor problem with nonnegative linear additive demand.
Eur. J. Oper. Res., 2018

2016
New structural properties of supply chains with price-only contracts.
Oper. Res. Lett., 2016

2015
The three-machine proportionate open shop and mixed shop minimum makespan problems.
Eur. J. Oper. Res., 2015

2013
Two-tier equilibria for supply chains with a single manufacturer and multiple asymmetric retailers.
Oper. Res. Lett., 2013

On index priority sequencing rules for scheduling with time-dependent job processing times.
Oper. Res. Lett., 2013

2011
A note on equilibria for two-tier supply chains with a single manufacturer and multiple retailers.
Oper. Res. Lett., 2011

A note on the classification of consumer demand functions with respect to retailer pass-through rates.
Eur. J. Oper. Res., 2011

2010
A note on the effects of downstream efficiency on upstream pricing.
Eur. J. Oper. Res., 2010

A unified analysis for the single-machine scheduling problem with controllable and non-controllable variable job processing times.
Eur. J. Oper. Res., 2010

2009
Sensitivity Analysis of Variational Inequality Problems.
Proceedings of the Encyclopedia of Optimization, Second Edition, 2009

Sensitivity Analysis of Complementarity Problems.
Proceedings of the Encyclopedia of Optimization, Second Edition, 2009

A modified LPT algorithm for the two uniform parallel machine makespan minimization problem.
Eur. J. Oper. Res., 2009

A note on the proportionate flow shop with a bottleneck machine.
Eur. J. Oper. Res., 2009

2008
Single-machine scheduling with waiting-time-dependent due dates.
Eur. J. Oper. Res., 2008

Single-machine scheduling problems with past-sequence-dependent setup times.
Eur. J. Oper. Res., 2008

An improved delayed-start LPT algorithm for a partition problem on two identical parallel machines.
Eur. J. Oper. Res., 2008

2007
A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines.
Eur. J. Oper. Res., 2007

Single-machine and two-machine flowshop scheduling with general learning functions.
Eur. J. Oper. Res., 2007

2006
A note on makespan minimization in two-stage flexible flow shops with uniform machines.
Eur. J. Oper. Res., 2006

Flexible flow shop scheduling with uniform parallel machines.
Eur. J. Oper. Res., 2006

Performance guarantees for flowshop heuristics to minimize makespan.
Eur. J. Oper. Res., 2006

2005
A correction to "Single machine scheduling with release times, deadlines and tardiness objectives" [EJOR 133 (2001) 447-453].
Eur. J. Oper. Res., 2005

2004
Concurrent flowshop scheduling to minimize makespan.
Eur. J. Oper. Res., 2004

Makespan minimization on uniform parallel machines with release times.
Eur. J. Oper. Res., 2004

Scheduling Three-Operation Jobs in a Two-Machine Flow Shop to Minimize Makespan.
Ann. Oper. Res., 2004

2002
Assembly-Line Scheduling with Concurrent Operations and Parallel Machines.
INFORMS J. Comput., 2002

2001
A note on weighted completion time minimization in a flexible flow shop.
Oper. Res. Lett., 2001

A note on scheduling flowshops with flexible stage ordering.
Eur. J. Oper. Res., 2001

Single machine scheduling with release times, deadlines and tardiness objectives.
Eur. J. Oper. Res., 2001

The three-stage assembly flowshop scheduling problem.
Comput. Oper. Res., 2001

2000
Scheduling on uniform parallel machines to minimize maximum lateness.
Oper. Res. Lett., 2000

Flow shop and open shop scheduling with a critical machine and two operations per job.
Eur. J. Oper. Res., 2000

Open shop scheduling with makespan and total completion time criteria.
Comput. Oper. Res., 2000

1997
Open Shop Scheduling with Maximal Machines.
Discret. Appl. Math., 1997


  Loading...