G. Srinivasan

This page is a disambiguation page, it actually contains mutiple papers from persons of the same or a similar name.

Bibliography

2013
An exact algorithm to minimize mean squared deviation of job completion times about a common due date.
Eur. J. Oper. Res., 2013

2010
Operator assignment/reassignment problems in incremental cell formation.
Int. J. Manuf. Technol. Manag., 2010

The impact of freight discount on the design of a product recovery network.
Int. J. Bus. Perform. Supply Chain Model., 2010

Completion time variance minimization in single machine and multi-machine systems.
Comput. Oper. Res., 2010

2007
Manufacturer's pricing strategies in a single-period framework under price-dependent stochastic demand with asymmetric risk-preference information.
J. Oper. Res. Soc., 2007

2006
Hierarchical minimization of completion time variance and makespan in jobshops.
Comput. Oper. Res., 2006

Multi-objectives for incremental cell formation problem.
Ann. Oper. Res., 2006

2003
A branch and bound algorithm to minimize completion time variance on a single processor.
Comput. Oper. Res., 2003

2001
Flow shop scheduling algorithms for minimizing the completion time variance and the sum of squares of completion time deviations from a common due date.
Eur. J. Oper. Res., 2001

1997
Using Spatial-Temporal Images for Analysis of Gated Cardiac Tomographic Data: The "M-Mode" Revisited.
Proceedings of the Information Processing in Medical Imaging, 1997


  Loading...