G. M. Komaki
Orcid: 0000-0001-9510-9735Affiliations:
- Case Western Reserve University, Cleveland, USA
According to our database1,
G. M. Komaki
authored at least 17 papers
between 2013 and 2021.
Collaborative distances:
Collaborative distances:
Timeline
2013
2014
2015
2016
2017
2018
2019
2020
2021
0
1
2
3
4
1
1
2
3
3
2
1
1
1
2
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on orcid.org
On csauthors.net:
Bibliography
2021
Basic Geometric Dispersion Theory of Decision Making Under Risk: Asymmetric Risk Relativity, New Predictions of Empirical Behaviors, and Risk Triad.
Decis. Anal., 2021
2019
Int. J. Prod. Res., 2019
2018
Comput. Ind. Eng., 2018
Comput. Ind. Eng., 2018
An Intelligent Water Drops Algorithm to Supply-Demand Hub in Industrial Cluster Considering Transportation Mode.
Proceedings of the IEEE International Conference on Big Data (IEEE BigData 2018), 2018
2017
A Multiobjective Approach for Multistage Reliability Growth Planning by Considering the Timing of New Technologies Introduction.
IEEE Trans. Reliab., 2017
General variable neighborhood search algorithm to minimize makespan of the distributed no-wait flow shop scheduling problem.
Prod. Eng., 2017
Improved discrete cuckoo optimization algorithm for the three-stage assembly flowshop scheduling problem.
Comput. Ind. Eng., 2017
2016
Enhanced intelligent water drops and cuckoo search algorithms for solving the capacitated vehicle routing problem.
Inf. Sci., 2016
An Enhanced Intelligent Water Drops Algorithm for Scheduling of an Agile Manufacturing System.
Int. J. Inf. Technol. Decis. Mak., 2016
Multi-objective control chart design optimization using NSGA-III and MOPSO enhanced with DEA and TOPSIS.
Expert Syst. Appl., 2016
2015
Grey Wolf Optimizer algorithm for the two-stage assembly flow shop scheduling problem with release time.
J. Comput. Sci., 2015
Comput. Ind. Eng., 2015
2014
Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times.
Comput. Oper. Res., 2014
A Hybrid Harmony Search algorithm to minimize total weighted tardiness in the permutation flow shop.
Proceedings of the 2014 IEEE Symposium on Computational Intelligence in Production and Logistics Systems, 2014
An improved optimization method based on the intelligent water drops algorithm for the vehicle routing problem.
Proceedings of the 2014 IEEE Symposium on Computational Intelligence in Production and Logistics Systems, 2014
2013
Single machine scheduling with controllable processing times to minimize total tardiness and earliness.
Comput. Ind. Eng., 2013