Francisco Ballestín

Orcid: 0000-0003-0661-1403

According to our database1, Francisco Ballestín authored at least 19 papers between 2003 and 2020.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2020
Mathematical models to improve the current practice in a Home Healthcare Unit.
OR Spectr., 2020

A multistage heuristic for storage and retrieval problems in a warehouse with random storage.
Int. Trans. Oper. Res., 2020

2019
Scheduling and rescheduling elective patients in operating rooms to minimise the percentage of tardy patients.
J. Sched., 2019

2013
Static and dynamic policies with RFID for the scheduling of retrieval and storage warehouse operations.
Comput. Ind. Eng., 2013

2011
An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags.
J. Sched., 2011

A double genetic algorithm for the MRCPSP/max.
Comput. Oper. Res., 2011

Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems.
Comput. Oper. Res., 2011

2009
Scheduling projects with limited number of preemptions.
Comput. Oper. Res., 2009

Using RFID information in routing and sequencing warehouse operations.
Proceedings of the Workshops Proceedings of the 5th International Conference on Intelligent Environments, 2009

2008
Different Codifications and Metaheuristic Algorithms for the Resource Renting Problem with Minimum and Maximum Time Lags.
Proceedings of the Recent Advances in Evolutionary Computation for Combinatorial Optimization, 2008

A hybrid genetic algorithm for the resource-constrained project scheduling problem.
Eur. J. Oper. Res., 2008

Pre-emption in resource-constrained project scheduling.
Eur. J. Oper. Res., 2008

Meta-heuristics for stable scheduling on a single machine.
Comput. Oper. Res., 2008

2007
When it is worthwhile to work with the stochastic RCPSP?
J. Sched., 2007

Heuristic procedures for reactive project scheduling.
Comput. Ind. Eng., 2007

A Genetic Algorithm for the Resource Renting Problem with Minimum and Maximum Time Lags.
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2007

2005
Justification and RCPSP: A technique that pays.
Eur. J. Oper. Res., 2005

2004
A Population-Based Approach to the Resource-Constrained Project Scheduling Problem.
Ann. Oper. Res., 2004

2003
Resource-constrained project scheduling: A critical activity reordering heuristic.
Eur. J. Oper. Res., 2003


  Loading...