Florian Jaehn

Orcid: 0000-0003-1778-1723

According to our database1, Florian Jaehn authored at least 34 papers between 2008 and 2024.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
Scheduling with jobs at fixed positions.
Eur. J. Oper. Res., 2024

The future of transport: Coordination in a new field between public and private transport.
Eur. J. Oper. Res., 2024

2023
Air Passenger Preferences: An International Comparison Affects Boarding Theory.
Oper. Res., May, 2023

2022
Transportation Labor Cost Reduction via Vehicle Platooning: Alternative Models and Solution Methods.
Transp. Sci., 2022

2021
Route Planning Under Uncertainty: A Case Study on Objectives Apart from Mean Travel Time.
Proceedings of the Operations Research Proceedings 2021, Selected Papers of the International Conference of the Swiss, German and Austrian Operations Research Societies (SVOR/ASRO, GOR e.V., ÖGOR), University of Bern, Switzerland, August 31, 2021

2020
Approximation algorithms for the twin robot scheduling problem.
J. Sched., 2020

Fair task allocation problem.
Ann. Oper. Res., 2020

2019
A generator for test instances of scheduling problems concerning cranes in transshipment terminals.
OR Spectr., 2019

An exact solution approach for scheduling cooperative gantry cranes.
Eur. J. Oper. Res., 2019

A Description of Supply Chain Planning Problems in the Paper Industry with Literature Review.
Asia Pac. J. Oper. Res., 2019

2018
Shunting operations at flat yards: retrieving freight railcars from storage tracks.
OR Spectr., 2018

Scheduling crossover cranes at container terminals during seaside peak times.
J. Heuristics, 2018

Scheduling cooperative gantry cranes with seaside and landside jobs.
Discret. Appl. Math., 2018

2017
An integrated model for the transshipment yard scheduling problem.
J. Sched., 2017

Flight gate assignment and recovery strategies with stochastic arrival and departure times.
OR Spectr., 2017

Scheduling Position-Dependent Maintenance Operations.
Oper. Res., 2017

An FPTAS of Minimizing Total Weighted Completion Time on Single Machine with Position Constraint.
Proceedings of the 28th International Symposium on Algorithms and Computation, 2017

2016
Scheduling with time-dependent discrepancy times.
J. Sched., 2016

Sustainable Operations.
Eur. J. Oper. Res., 2016

Shunting of trains in succeeding yards.
Comput. Ind. Eng., 2016

2015
Minimizing delays in a shunting yard.
OR Spectr., 2015

Airplane boarding.
Eur. J. Oper. Res., 2015

2013
A Survey on Container Processing in Railway Yards.
Transp. Sci., 2013

Exact algorithms for inventory constrained scheduling on a single machine.
J. Sched., 2013

Positioning of loading units in a transshipment yard storage area.
OR Spectr., 2013

A note on "Multistage Methods for Freight Train Classification".
Networks, 2013

New bounds and constraint propagation techniques for the clique partitioning problem.
Discret. Appl. Math., 2013

2012
New bounds and algorithms for the transshipment yard scheduling problem.
J. Sched., 2012

Shunting yard operations: Theoretical aspects and applications.
Eur. J. Oper. Res., 2012

Flight gate scheduling with respect to a reference schedule.
Ann. Oper. Res., 2012

2011
Scheduling Freight Trains in Rail-Rail Transshipment Yards.
Transp. Sci., 2011

2010
Extensions to STaTS for practical applications of the facility layout problem.
Eur. J. Oper. Res., 2010

The emissions trading paradox.
Eur. J. Oper. Res., 2010

2008
Modelling Robust Flight-Gate Scheduling as a Clique Partitioning Problem.
Transp. Sci., 2008


  Loading...