Feng-Jang Hwang

Orcid: 0000-0002-1741-5590

Affiliations:
  • University of Technology Sydney, Australia
  • National Chiao Tung University, Hsinchu, Taiwan


According to our database1, Feng-Jang Hwang authored at least 32 papers between 2011 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Intelligent Clinic Nurse Scheduling Considering Nurses Paired with Doctors and Preference of Nurses.
J. Medical Syst., December, 2024

Dynamic Spatiotemporal Straight-Flow Network for Efficient Learning and Accurate Forecasting in Traffic.
IEEE Trans. Intell. Transp. Syst., November, 2024

A two-stage method for the shipper lane selection problem with time windows in transportation service procurement.
Int. Trans. Oper. Res., July, 2024

Multi-view spatiotemporal learning for traffic forecasting.
Inf. Sci., February, 2024

Metro Station functional clustering and dual-view recurrent graph convolutional network for metro passenger flow prediction.
Expert Syst. Appl., 2024

2023
Fast Spatiotemporal Learning Framework for Traffic Flow Forecasting.
IEEE Trans. Intell. Transp. Syst., August, 2023

Travel Time Prediction Method Based on Spatial-Feature-based Hierarchical Clustering and Deep Multi-input Gated Recurrent Unit.
ACM Trans. Sens. Networks, May, 2023

De-Correlation Neural Network for Synchronous Implementation of Estimation and Secrecy.
IEEE Commun. Lett., January, 2023

2022
Neuron-Network-Based Mixture Probability Model for Passenger Walking Time Distribution Estimation.
IEICE Trans. Inf. Syst., 2022

Machine learning and deep learning methods for wireless network applications.
EURASIP J. Wirel. Commun. Netw., 2022

2021
Editorial.
Int. J. Distributed Sens. Networks, 2021

Maritime Target Detection Based on Electronic Image Stabilization Technology of Shipborne Camera.
IEICE Trans. Inf. Syst., 2021

An effective logarithmic formulation for piecewise linearization requiring no inequality constraint.
Comput. Optim. Appl., 2021

Urban Public Transport Accessibility to Medical Services From the Perspective of Residents' Travel: A Hybrid Assessment Based on the Whole Process.
IEEE Access, 2021

2020
Parallel and distributed architecture of genetic algorithm on Apache Hadoop and Spark.
Appl. Soft Comput., 2020

2019
Travel Time Prediction System Based on Data Clustering for Waste Collection Vehicles.
IEICE Trans. Inf. Syst., 2019

Makespan minimization for the <i>m</i>-machine ordered flow shop scheduling problem.
Comput. Oper. Res., 2019

A Mobile Positioning Method Based on Integrated Heterogeneous Networks for Commercial Vehicle Operation System.
Proceedings of the IEEE International Conference on Industrial Internet, 2019

2018
Introduction to the Special Issue: Applications of Internet of Things.
Symmetry, 2018

Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines.
Comput. Oper. Res., 2018

2017
Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence.
J. Sched., 2017

An Augmented Reality Question Answering System Based on Ensemble Neural Networks.
IEEE Access, 2017

2016
Relocation scheduling subject to fixed processing sequences.
J. Sched., 2016

Two-stage flexible flow shop scheduling subject to fixed job sequences.
J. Oper. Res. Soc., 2016

Acquisition planning and scheduling of computing resources.
Comput. Oper. Res., 2016

Bi-criteria sequencing of courses and formation of classes for a bottleneck classroom.
Comput. Oper. Res., 2016

An effective placement method for the single container loading problem.
Comput. Ind. Eng., 2016

2014
Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence.
Ann. Oper. Res., 2014

2012
Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence.
J. Oper. Res. Soc., 2012

Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence.
Discret. Optim., 2012

2011
Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type.
Inf. Process. Lett., 2011

Coupled-task scheduling on a single machine subject to a fixed-job-sequence.
Comput. Ind. Eng., 2011


  Loading...