Fatima Ghedjati

Orcid: 0000-0001-5078-0613

According to our database1, Fatima Ghedjati authored at least 7 papers between 2008 and 2011.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2011
An Ant Colony System Algorithm for the Hybrid Flow-Shop Scheduling Problem.
Int. J. Appl. Metaheuristic Comput., 2011

2010
A meta-heuristic approach to solve a JIT scheduling problem in hybrid flow shop.
Eng. Appl. Artif. Intell., 2010

Variety of meta-heuristics based on genetic algorithms to solve a generalized job-shop problem.
Proceedings of the IEEE International Conference on Systems, 2010

Heuristics and a hybrid meta-heuristic for a generalized job-shop scheduling problem.
Proceedings of the IEEE Congress on Evolutionary Computation, 2010

2009
Dynamic heuristics for the generalized job-shop scheduling problem.
Proceedings of the IEEE International Conference on Systems, 2009

2008
Hybrid approach using ant colony optimization and fuzzy logic to solve multi-criteria hybrid flow shop scheduling problem.
Proceedings of the CSTST 2008: Proceedings of the 5th International Conference on Soft Computing as Transdisciplinary Science and Technology, 2008

Ant colony optimization for solving a bi-criteria hybrid flow shop problem.
Proceedings of the IEEE International Conference on Systems, 2008


  Loading...