Fariborz Jolai

Orcid: 0000-0003-0824-8513

Affiliations:
  • University of Tehran, Iran


According to our database1, Fariborz Jolai authored at least 104 papers between 2005 and 2024.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Strategic planning for hub resilience: a stochastic location-routing perspective.
Oper. Res., December, 2024

A new mathematical model for designing and improving the performance of a home health care logistics network.
Ann. Oper. Res., September, 2024

Augmented data strategies for enhanced computer vision performance in breast cancer diagnosis.
J. Ambient Intell. Humaniz. Comput., July, 2024

Strategies for Humanitarian Logistics and Supply Chain in Organizational Contexts: Pre- and Post-Disaster Management Perspectives.
Syst., 2024

A data-driven decision-making approach for evaluating the projects according to resilience, circular economy and industry 4.0 dimension.
Eng. Appl. Artif. Intell., 2024

BPM application in clinical process improvement: a women 'hospital case study.
Bus. Process. Manag. J., 2024

2023
Developing a supervised learning-based simulation method as a decision support tool for rebalancing problems in bike-sharing systems.
Expert Syst. Appl., December, 2023

A multi-criteria decision-making model for analyzing a project-driven supply chain under interval type-2 fuzzy sets.
Appl. Soft Comput., November, 2023

A Markovian-based fuzzy decision-making approach for the customer-based sustainable-resilient supplier selection problem.
Soft Comput., October, 2023

Disruption-resilient supply chain entities with decentralized robust-stochastic capacity planning.
Reliab. Eng. Syst. Saf., October, 2023

A state-dependent M/M/1 queueing location-allocation model for vaccine distribution using metaheuristic algorithms.
J. Comput. Des. Eng., July, 2023

Factor identification for insurance pricing mechanism using data mining and multi criteria decision making.
J. Ambient Intell. Humaniz. Comput., July, 2023

A two-stages mathematical model for a Covid-19 vaccination fuzzy scheme and resource allocation in hub locations considering transmission risk and environment factor.
RAIRO Oper. Res., May, 2023

A new risk quantification method in project-driven supply chain by MABACODAS method under interval type-2 fuzzy environment with a case study.
Eng. Appl. Artif. Intell., March, 2023

Bi-objective collaborative electric vehicle routing problem: mathematical modeling and matheuristic approach.
J. Ambient Intell. Humaniz. Comput., 2023

Financing a two-stage sustainable supply chain using green bonds: Preventing environmental pollution and waste generation.
Eng. Appl. Artif. Intell., 2023

2022
A multi-objective optimization framework for a sustainable closed-loop supply chain network in the olive industry: Hybrid meta-heuristic algorithms.
Expert Syst. Appl., October, 2022

A meta heuristic approach for reliable capacitated facility joint inventory-location problem with round-trip transportation under imperfect information of disruption in a Fuzzy environment.
RAIRO Oper. Res., September, 2022

A latency-aware task scheduling algorithm for allocating virtual machines in a cost-effective and time-sensitive fog-cloud architecture.
J. Supercomput., 2022

Designing a humanitarian relief network considering governmental and non-governmental operations under uncertainty.
Int. J. Syst. Assur. Eng. Manag., 2022

Two heuristic methods based on decomposition to the integrated multi-agent supply chain scheduling and distribution problem.
Optim. Methods Softw., 2022

Statistical analysis of blood characteristics of COVID-19 patients and their survival or death prediction using machine learning algorithms.
Neural Comput. Appl., 2022

An integrated queueing-inventory-routing problem in a green dual-channel supply chain considering pricing and delivery period: a case study of construction material supplier.
J. Comput. Des. Eng., 2022

Prioritizing and queueing the emergency departments' patients using a novel data-driven decision-making methodology, a real case study.
Expert Syst. Appl., 2022

A collaborative humanitarian relief chain design for disaster response.
Comput. Ind. Eng., 2022

A robust fuzzy stochastic model for the responsive-resilient inventory-location problem: comparison of metaheuristic algorithms.
Ann. Oper. Res., 2022

2021
A new two-stage nurse scheduling approach based on occupational justice considering assurance attendance in works shifts by using Z-number method: A real case study.
RAIRO Oper. Res., 2021

A novel vehicle routing problem for vaccine distribution using SIR epidemic model.
OR Spectr., 2021

A Pareto approach for the multi-factory supply chain scheduling and distribution problem.
Oper. Res., 2021

A new fuzzy-stochastic compromise ratio approach for green supplier selection problem with interval-valued possibilistic statistical information.
Neural Comput. Appl., 2021

A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation.
Math. Comput. Simul., 2021

Formulating and solving the integrated online order batching and delivery planning with specific due dates for orders.
J. Intell. Fuzzy Syst., 2021

An ERNSGA-III algorithm for the production and distribution planning problem in the multiagent supply chain.
Int. Trans. Oper. Res., 2021

Positioning push-pull boundary in a hesitant fuzzy environment.
Expert Syst. J. Knowl. Eng., 2021

A rule-based heuristic algorithm for joint order batching and delivery planning of online retailers with multiple order pickers.
Appl. Intell., 2021

Designing a Humanitarian Supply Chain for Pre and Post Disaster Planning with Transshipment and Considering Perishability of Products.
Proceedings of the Intelligent Systems Design and Applications, 2021

2020
General lot-sizing and scheduling for perishable food products.
RAIRO Oper. Res., 2020

2019
A satisfactory multi-agent single-machine considering a cross-docking terminal.
Int. J. Syst. Syst. Eng., 2019

A branch and price approach to the two-agent integrated production and distribution scheduling.
Comput. Ind. Eng., 2019

2018
A hybrid ranking approach based on fuzzy analytical hierarchy process and data envelopment analysis: Road maintenance and transport organization of Iran.
J. Intell. Fuzzy Syst., 2018

Flexibility in service parts supply chain: a study on emergency resupply in aviation MRO.
Int. J. Prod. Res., 2018

An integrated weighted fuzzy multi-objective model for supplier selection and order scheduling in a supply chain.
Int. J. Prod. Res., 2018

Quantifying the Resilience of Cloud-Based Manufacturing Composite Services.
Int. J. Cloud Appl. Comput., 2018

A multi-agent approach to the integrated production scheduling and distribution problem in multi-factory supply chain.
Appl. Soft Comput., 2018

Location-Pricing Problem in the Closed-Loop Supply Chain Network Design Under Uncertainty.
Proceedings of the Service Orientation in Holonic and Multi-Agent Manufacturing, 2018

2017
A single-machine scheduling problem with multiple unavailability constraints: A mathematical model and an enhanced variable neighborhood search approach.
J. Comput. Des. Eng., 2017

Integrated production-distribution planning in two-echelon systems: a resilience view.
Int. J. Prod. Res., 2017

A simulation optimisation approach for real-time scheduling in an open shop environment using a composite dispatching rule.
Int. J. Comput. Integr. Manuf., 2017

Robust and Fuzzy Optimisation Models for a Flow shop Scheduling Problem with Sequence Dependent Setup Times: A real case study on a PCB assembly company.
Int. J. Comput. Integr. Manuf., 2017

A novel approach to determine a tactical and operational decision for dynamic appointment scheduling at nuclear medical center.
Comput. Oper. Res., 2017

Optimizing the sum of maximum earliness and tardiness of the job shop scheduling problem.
Comput. Ind. Eng., 2017

An interactive possibilistic programming approach for a multi-objective hub location problem: Economic and environmental design.
Appl. Soft Comput., 2017

2016
Active fuzzy modeling for estimating problems in hydrocarbon reservoirs.
Neural Comput. Appl., 2016

Lion Optimization Algorithm (LOA): A nature-inspired metaheuristic algorithm.
J. Comput. Des. Eng., 2016

A parallel machine scheduling problem with two-agent and tool change activities: an efficient hybrid metaheuristic algorithm.
Int. J. Comput. Integr. Manuf., 2016

A biogeography-based optimisation algorithm for a realistic no-wait hybrid flow shop with unrelated parallel machines to minimise mean tardiness.
Int. J. Comput. Integr. Manuf., 2016

2015
No-wait flexible flowshop with uniform parallel machines and sequence-dependent setup time: a hybrid meta-heuristic approach.
J. Intell. Manuf., 2015

A credibility-constrained programming for reliable forward-reverse logistics network design under uncertainty and facility disruptions.
Int. J. Comput. Integr. Manuf., 2015

A new stochastic approach for a reliable p-hub covering location problem.
Comput. Ind. Eng., 2015

2014
A hybrid electromagnetism-like algorithm for dynamic inter/intra-cell layout problem.
Int. J. Comput. Integr. Manuf., 2014

Incorporating learning effect and deterioration for solving a SDST flexible job-shop scheduling problem with a hybrid meta-heuristic approach.
Int. J. Comput. Integr. Manuf., 2014

Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs.
Comput. Oper. Res., 2014

2013
Revisiting a fuzzy rough economic order quantity model for deteriorating items considering quantity discount and prepayment.
Math. Comput. Model., 2013

A two-stage hybrid flowshop scheduling problem in machine breakdown condition.
J. Intell. Manuf., 2013

A fuzzy grey model based on the compromise ranking for multi-criteria group decision making problems in manufacturing systems.
J. Intell. Fuzzy Syst., 2013

A hybrid multi-objective approach based on the genetic algorithm and neural network to design an incremental cellular manufacturing system.
Comput. Ind. Eng., 2013

A Simulated Annealing algorithm for a mixed model assembly U-line balancing type-I problem considering human efficiency and Just-In-Time approach.
Comput. Ind. Eng., 2013

2012
Cyclic scheduling of a robotic flexible cell with load lock and swap.
J. Intell. Manuf., 2012

Mixed-model assembly line balancing in the make-to-order and stochastic environment using multi-objective evolutionary algorithms.
Expert Syst. Appl., 2012

An Electromagnetism-like algorithm for cell formation and layout problem.
Expert Syst. Appl., 2012

Comparison of different input selection algorithms in neuro-fuzzy modeling.
Expert Syst. Appl., 2012

An inventory model for imperfect items under inflationary conditions with considering inspection errors.
Comput. Math. Appl., 2012

A fuzzy based threshold policy for a single server retrial queue with vacations.
Central Eur. J. Oper. Res., 2012

Minimizing makespan on a three-machine flowshop batch scheduling problem with transportation using genetic algorithm.
Appl. Soft Comput., 2012

Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration.
Adv. Eng. Softw., 2012

2011
An M/M/c queue model for hub covering location problem.
Math. Comput. Model., 2011

A hybrid memetic algorithm for maximizing the weighted number of just-in-time jobs on unrelated parallel machines.
J. Intell. Manuf., 2011

An adaptive neuro-fuzzy system for stock portfolio analysis.
Int. J. Intell. Syst., 2011

A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain.
Comput. Math. Appl., 2011

A fuzzy goal programming and meta heuristic algorithms for solving integrated production: distribution planning problem.
Central Eur. J. Oper. Res., 2011

A hybrid approach based on the genetic algorithm and neural network to design an incremental cellular manufacturing system.
Appl. Soft Comput., 2011

A new approach in supply chain modeling.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011

2010
Heuristics for minimizing total completion time and maximum lateness on identical parallel machines with setup times.
J. Intell. Manuf., 2010

Two robust meta-heuristics for scheduling multiple job classes on a single machine with multiple criteria.
Expert Syst. Appl., 2010

Integrating data transformation techniques with Hopfield neural networks for solving travelling salesman problem.
Expert Syst. Appl., 2010

An effective hybrid multi-objective genetic algorithm for bi-criteria scheduling on a single batch processing machine with non-identical job sizes.
Eng. Appl. Artif. Intell., 2010

The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem.
Appl. Soft Comput., 2010

Designing a Genetic Algorithm to Solve an Integrated Model in Supply Chain Management Using Fuzzy Goal Programming Approach.
Proceedings of the Balanced Automation Systems for Future Manufacturing Networks, 2010

A Hybrid Cellular Genetic Algorithm for Multi-objective Crew Scheduling Problem.
Proceedings of the Hybrid Artificial Intelligence Systems, 5th International Conference, 2010

2009
Multi-criteria decision making for assembly line balancing.
J. Intell. Manuf., 2009

A variable neighborhood search for job shop scheduling with set-up times to minimize makespan.
Future Gener. Comput. Syst., 2009

A memetic algorithm for minimizing the total weighted completion time on a single machine under step-deterioration.
Adv. Eng. Softw., 2009

2008
No-wait flow shop scheduling using fuzzy multi-objective linear programming.
J. Frankl. Inst., 2008

Performance estimation of an email contact center by a finite source discrete time Geo/Geo/1 queue with disasters.
Comput. Ind. Eng., 2008

2007
Mathematical modeling and heuristic approaches to flexible job shop scheduling problems.
J. Intell. Manuf., 2007

A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept.
Eur. J. Oper. Res., 2007

Exact algorithm for bi-objective 0-1 knapsack problem.
Appl. Math. Comput., 2007

Genetic algorithm for bi-criteria single machine scheduling problem of minimizing maximum earliness and number of tardy jobs.
Appl. Math. Comput., 2007

A multi-objective scatter search for a mixed-model assembly line sequencing problem.
Adv. Eng. Informatics, 2007

2006
An economic production lot size model with deteriorating items, stock-dependent demand, inflation, and partial backlogging.
Appl. Math. Comput., 2006

Mixed-Model Assembly Line Sequencing Using Real Options.
Proceedings of the Operations Research, 2006

Minimizing Makespan on a Single Batch Processing Machine with Non-identical Job Sizes: A Hybrid Genetic Approach.
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2006

2005
Minimizing number of tardy jobs on a batch processing machine with incompatible job families.
Eur. J. Oper. Res., 2005

A hybrid method for solving stochastic job shop scheduling problems.
Appl. Math. Comput., 2005


  Loading...