Fardin Ahmadizar

Orcid: 0000-0002-8615-9893

According to our database1, Fardin Ahmadizar authored at least 18 papers between 2010 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
A bi-objective workflow scheduling in virtualized fog-cloud computing using NSGA-II with semi-greedy initialization.
Appl. Soft Comput., January, 2024

2023
An equitable and accessible vaccine supply chain network in the epidemic outbreak of COVID-19 under uncertainty.
J. Ambient Intell. Humaniz. Comput., 2023

A sustainable and efficient home health care network design model under uncertainty.
Expert Syst. Appl., 2023

2021
Locations of congested facilities with interruptible immobile servers.
Comput. Ind. Eng., 2021

A three-phase methodology for home healthcare routing and scheduling under uncertainty.
Comput. Ind. Eng., 2021

2018
A novel multivariate filter method for feature selection in text classification problems.
Eng. Appl. Artif. Intell., 2018

2017
Stochastic group shop scheduling with fuzzy due dates.
J. Intell. Fuzzy Syst., 2017

2015
Artificial neural network development by means of a novel combination of grammatical evolution and genetic algorithm.
Eng. Appl. Artif. Intell., 2015

Single-machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs.
Comput. Oper. Res., 2015

2014
Bi-objective supply chain planning in a fuzzy environment.
J. Intell. Fuzzy Syst., 2014

2012
Multi-objective genetic algorithm for cell formation problem considering cellular layout and operations scheduling.
Int. J. Comput. Integr. Manuf., 2012

A new ant colony algorithm for makespan minimization in permutation flow shops.
Comput. Ind. Eng., 2012

2011
A Novel Ant Colony Algorithm for the Single-Machine Total Weighted Tardiness Problem with Sequence Dependent Setup Times.
Int. J. Comput. Intell. Syst., 2011

A stochastic model for the generalised cell formation problem considering machine reliability.
Int. J. Comput. Integr. Manuf., 2011

Reliability optimization of a series system with multiple-choice and budget constraints using an efficient ant colony approach.
Expert Syst. Appl., 2011

Application of fuzzy mathematical programming to optimize an integrated production-distribution system.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011

2010
A hybrid algorithm to minimize makespan for the permutation flow shop scheduling problem.
Int. J. Comput. Intell. Syst., 2010

Group shops scheduling with makespan criterion subject to random release dates and processing times.
Comput. Oper. Res., 2010


  Loading...