Faicel Hnaien

Orcid: 0000-0002-3037-9280

Affiliations:
  • University of Technology of Troyes, LIST3N, Troyes, France
  • Ecole des Mines de Saint Etienne, France (PhD 2008)


According to our database1, Faicel Hnaien authored at least 33 papers between 2006 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Enhanced QUBO Formulations for The Flow Shop Scheduling Problem.
Proceedings of the Genetic and Evolutionary Computation Conference Companion, 2024

Simultaneous Backward Reduction algorithm for disassembly lot-sizing under random ordering lead time.
Proceedings of the 10th International Conference on Control, 2024

2023
Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown.
Ann. Oper. Res., September, 2023

Pricing-inventory model with discrete demand and delivery orders.
Oper. Res. Decis., 2023

Two-stage Stochastic Program for Capacitated Disassembly Lot-sizing Under Random Yield.
Proceedings of the IEEE International Conference on Networking, Sensing and Control, 2023

Solving the Flow-Shop Scheduling problem using Grover's Algorithm.
Proceedings of the Companion Proceedings of the Conference on Genetic and Evolutionary Computation, 2023

Predictive maintenance planning for railway systems.
Proceedings of the 7th IEEE Congress on Information Science and Technology, 2023

2022
A robust optimization approach for disassembly assembly routing problem under uncertain yields.
Expert Syst. Appl., 2022

Exact method to optimize the total electricity cost in two-machine permutation flow shop scheduling problem under Time-of-use tariff.
Comput. Oper. Res., 2022

2021
Electricity cost minimisation for optimal makespan solution in flow shop scheduling under time-of-use tariffs.
Int. J. Prod. Res., 2021

2020
Formulations and solution algorithms for dynamic assembly routing problem.
Int. J. Prod. Res., 2020

A hybrid genetic algorithm for a multilevel assembly replenishment planning problem with stochastic lead times.
Comput. Ind. Eng., 2020

2019
Minimising the makespan in the two-machine job shop problem under availability constraints.
Int. J. Prod. Res., 2019

2018
Signal processing on graphs: Case of sampling in Paley-Wiener spaces.
Signal Process., 2018

Two-machine job shop problem under availability constraints on one machine: Makespan minimization.
Comput. Ind. Eng., 2018

2016
A bi-objective model for wireless sensor deployment considering coverage and tracking applications.
Int. J. Sens. Networks, 2016

A mapping technique for better solution exploration: NSGA-II adaptation.
J. Heuristics, 2016

Handling uncertainty in agricultural supply chain management: A state of the art.
Eur. J. Oper. Res., 2016

2015
A Specific Heuristic Dedicated to a Coverage/Tracking Bi-objective Problem for Wireless Sensor Deployment.
Wirel. Pers. Commun., 2015

A multi-step rolled forward chance-constrained model and a proactive dynamic approach for the wheat crop quality control problem.
Eur. J. Oper. Res., 2015

Sensor deployment optimization methods to achieve both coverage and connectivity in wireless sensor networks.
Comput. Oper. Res., 2015

2014
A Branch and Bound Algorithm for the Critical Grid Coverage Problem in Wireless Sensor Networks.
Int. J. Distributed Sens. Networks, 2014

An Interval Programming Approach for an Operational Transportation Planning Problem.
Proceedings of the Information Processing and Management of Uncertainty in Knowledge-Based Systems, 2014

A Decision Support System for Efficient Crop Production Supply Chain Management.
Proceedings of the Computational Science and Its Applications - ICCSA 2014 - 14th International Conference, Guimarães, Portugal, June 30, 2014

2013
A Bi-Criteria Flow-Shop Scheduling with Preventive Maintenance.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Integration of Additional Purchase Cost to Reduce the Lead Time Uncertainty for One Level Assembly System.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Supply Planning and Inventory Control under Lead Time Uncertainty: A Review.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

A discrete event simulation model for harvest operations under stochastic conditions.
Proceedings of 10th IEEE International Conference on Networking, Sensing and Control, 2013

2010
Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times.
Comput. Oper. Res., 2010

The Joint Load Balancing and Parallel Machine Scheduling Problem.
Proceedings of the Operations Research Proceedings 2010, 2010

2009
Genetic algorithm for supply planning in two-level assembly systems with random lead times.
Eng. Appl. Artif. Intell., 2009

2008
Planned lead times for one-level assembly system with service level constraint.
Proceedings of 13th IEEE International Conference on Emerging Technologies and Factory Automation, 2008

2006
A Supply Planning Model for Multilevel Assembly Systems Under Random Lead Times.
Proceedings of 11th IEEE International Conference on Emerging Technologies and Factory Automation, 2006


  Loading...