Ertan Güner

According to our database1, Ertan Güner authored at least 14 papers between 1996 and 2012.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2012
Reply to note on The common due-date early/tardy scheduling problem on a parallel machine under the effects of time-dependent learning and linear and nonlinear deterioration.
Expert Syst. Appl., 2012

2011
Joint reply to the erratum and the note on "Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning" [Math. Comput. Modelling 50 (2009) 401-406].
Math. Comput. Model., 2011

2010
Some scheduling problems with past sequence dependent setup times under the effects of nonlinear deterioration and time-dependent learning.
RAIRO Oper. Res., 2010

Parallel machine scheduling problem to minimize the earliness/tardiness costs with learning effect and deteriorating jobs.
J. Intell. Manuf., 2010

Assembly line balancing problem with deterioration tasks and learning effect.
Expert Syst. Appl., 2010

The common due-date early/tardy scheduling problem on a parallelmachine under the effects of time-dependent learning and linear and nonlinear deterioration.
Expert Syst. Appl., 2010

2009
Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning.
Math. Comput. Model., 2009

Parallel machine earliness/tardiness scheduling problem under the effects of position based learning and linear/nonlinear deterioration.
Comput. Oper. Res., 2009

Analyzing the behaviors of virtual cells (VCs) and traditional manufacturing systems: Ant colony optimization (ACO)-based metamodels.
Comput. Oper. Res., 2009

2007
A Bicriteria Scheduling Problem with a Learning Effect: Total Completion Time and Total Tardiness.
INFOR Inf. Syst. Oper. Res., 2007

2006
A bicriteria flowshop scheduling problem with setup times.
Appl. Math. Comput., 2006

A bicriteria scheduling with sequence-dependent setup times.
Appl. Math. Comput., 2006

2002
Three-finger SMA robot hand and its practical analysis.
Robotica, 2002

1996
Concept of an autonomous disassembly system using behavior-based robotics.
Adv. Robotics, 1996


  Loading...