Erik Demeulemeester
Orcid: 0000-0001-7799-6510
According to our database1,
Erik Demeulemeester
authored at least 83 papers
between 1993 and 2025.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on orcid.org
On csauthors.net:
Bibliography
2025
Surrogate-assisted cooperative learning genetic programming for the resource-constrained project scheduling problem with stochastic activity durations and transfer times.
Comput. Oper. Res., 2025
2024
Ann. Oper. Res., July, 2024
Capacity and surgery partitioning: An approach for improving surgery scheduling in the inpatient surgical department.
Eur. J. Oper. Res., February, 2024
A three-dimensional spatial resource-constrained project scheduling problem: Model and heuristic.
Eur. J. Oper. Res., 2024
Branch-Price-and-Cut algorithms for the team orienteering problem with interval-varying profits.
Eur. J. Oper. Res., 2024
A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply.
Comput. Oper. Res., 2024
2023
Integrated resource-constrained project scheduling and material ordering problem considering storage space allocation.
Comput. Ind. Eng., November, 2023
Comput. Oper. Res., May, 2023
Unrelated parallel machine scheduling with multiple time windows: An application to earth observation satellite scheduling.
Comput. Oper. Res., 2023
2022
A predictive-reactive approach for the sequencing of assembly operations in an automated assembly line.
Robotics Comput. Integr. Manuf., 2022
Minimising the number of cancellations at the time of a severe lack of postanesthesia care unit beds or nurses.
Int. J. Prod. Res., 2022
Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty.
Comput. Oper. Res., 2022
2021
A bi-objective robust resource allocation model for the RCPSP considering resource transfer costs.
Int. J. Prod. Res., 2021
Simulation-based priority rules for the stochastic resource-constrained net present value and risk problem.
Comput. Ind. Eng., 2021
2020
Expectation and SAA Models and Algorithms for Scheduling of Multiple Earth Observation Satellites Under the Impact of Clouds.
IEEE Syst. J., 2020
The integration of resource allocation and time buffering for bi-objective robust project scheduling.
Int. J. Prod. Res., 2020
A Bayesian approach to set the tolerance limits for a statistical project control method.
Int. J. Prod. Res., 2020
The distributionally robust machine scheduling problem with job selection and sequence-dependent setup times.
Comput. Oper. Res., 2020
2019
A Genetic Algorithm for the Proactive Resource-Constrained Project Scheduling Problem With Activity Splitting.
IEEE Trans. Engineering Management, 2019
Exact and Heuristic Scheduling Algorithms for Multiple Earth Observation Satellites Under Uncertainties of Clouds.
IEEE Syst. J., 2019
J. Sched., 2019
Robust resource-constrained max-NPV project scheduling with stochastic activity duration.
OR Spectr., 2019
A novel branch-and-bound algorithm for the chance-constrained resource-constrained project scheduling problem.
Int. J. Prod. Res., 2019
Eur. J. Oper. Res., 2019
A computational experiment to explore better robustness measures for project scheduling under two types of uncertain environments.
Comput. Ind. Eng., 2019
Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem.
Ann. Oper. Res., 2019
2018
Efficient priority rules for the stochastic resource-constrained project scheduling problem.
Eur. J. Oper. Res., 2018
A model enhancement approach for optimizing the integrated shift scheduling and vehicle routing problem in waste collection.
Eur. J. Oper. Res., 2018
A three-stage mixed integer programming approach for optimizing the skill mix and training schedules for aircraft maintenance.
Eur. J. Oper. Res., 2018
2016
A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations.
J. Sched., 2016
Exact algorithms for single-machine scheduling with time windows and precedence constraints.
J. Sched., 2016
Incorporation of activity sensitivity measures into buffer management to manage project schedule risk.
Eur. J. Oper. Res., 2016
A pure proactive scheduling algorithm for multiple earth observation satellites under uncertainties of clouds.
Comput. Oper. Res., 2016
2015
Fault-Tolerant Scheduling for Real-Time Tasks on Multiple Earth-Observation Satellites.
IEEE Trans. Parallel Distributed Syst., 2015
A model enhancement heuristic for building robust aircraft maintenance personnel rosters with stochastic constraints.
Eur. J. Oper. Res., 2015
Determining the timing of project control points using a facility location model and simulation.
Comput. Oper. Res., 2015
2014
Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment.
Ann. Oper. Res., 2014
2013
A three-stage approach for aircraft line maintenance personnel rostering using MIP, discrete event simulation and DEA.
Expert Syst. Appl., 2013
Comput. Oper. Res., 2013
Comput. Oper. Res., 2013
2012
Interfaces, 2012
2011
Int. J. Inf. Technol. Decis. Mak., 2011
Proactive policies for the stochastic resource-constrained project scheduling problem.
Eur. J. Oper. Res., 2011
Time slack-based techniques for robust project scheduling subject to resource uncertainty.
Ann. Oper. Res., 2011
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011
2010
Eur. J. Oper. Res., 2010
2009
A decision support system for cyclic master surgery scheduling with multiple objectives.
J. Sched., 2009
Sequencing surgical cases in a day-care environment: An exact branch-and-price approach.
Comput. Oper. Res., 2009
2008
Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities.
J. Sched., 2008
J. Medical Syst., 2008
Proactive heuristic procedures for robust project scheduling: An experimental analysis.
Eur. J. Oper. Res., 2008
Eur. J. Oper. Res., 2008
2007
J. Sched., 2007
J. Sched., 2007
Eur. J. Oper. Res., 2007
Decis. Sci., 2007
On the trade-off between staff-decomposed and activity-decomposed column generation for a staff scheduling problem.
Ann. Oper. Res., 2007
2006
Visualizing the Demand for Various Resources as a Function of the Master Surgery Schedule: A Case Study.
J. Medical Syst., 2006
Eur. J. Oper. Res., 2006
2004
Book Review/Project Scheduling with Time Windows and Scarce Resources by Klaus Neumann, Christoph Schwindt and Jürgen Zimmermann.
J. Sched., 2004
2003
J. Sched., 2003
2002
J. Oper. Res. Soc., 2002
2001
On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints.
Manag. Sci., 2001
A note on the paper "Resource-constrained project scheduling: Notation, classification, models and methods" by Brucker et al.
Eur. J. Oper. Res., 2001
An Exact Procedure for the Resource-Constrained Weighted Earliness-Tardiness Project Scheduling Problem.
Ann. Oper. Res., 2001
1998
New computational results on the discrete time/cost trade-off problem in project networks.
J. Oper. Res. Soc., 1998
Comput. Oper. Res., 1998
1997
A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem.
Oper. Res., 1997
Project network models with discounted cash flows a guided tour through recent developments.
Eur. J. Oper. Res., 1997
1993