Engin Topan

Orcid: 0000-0002-4048-3073

According to our database1, Engin Topan authored at least 12 papers between 2010 and 2022.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2022
Using supervised machine learning for B2B sales forecasting: A case study of spare parts sales forecasting at an after-sales service provider.
Expert Syst. Appl., 2022

Weighted earliness/tardiness parallel machine scheduling problem with a common due date.
Expert Syst. Appl., 2022

Operational planning in service control towers - heuristics and case study.
Eur. J. Oper. Res., 2022

2021
Machine tools with hidden defects: Optimal usage for maximum lifetime value.
IISE Trans., 2021

Application of data-driven models to predictive maintenance: Bearing wear prediction at TATA steel.
Expert Syst. Appl., 2021

2020
Operational level planning of a multi-item two-echelon spare parts inventory system with reactive and proactive interventions.
Eur. J. Oper. Res., 2020

A review of operational spare parts service logistics in service control towers.
Eur. J. Oper. Res., 2020

2017
Heuristics for multi-item two-echelon spare parts inventory control subject to aggregate and individual service measures.
Eur. J. Oper. Res., 2017

2012
Multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse under compound Poisson demand.
J. Oper. Res. Soc., 2012

2011
An approximation for kanban controlled assembly systems.
Ann. Oper. Res., 2011

2010
Multi-Item Two-Echelon Spare Parts Inventory Control Problem with Batch Ordering in the Central Warehouse ; Merkezi depoda toplu siparişin olduğu çok ürünlü iki seviyeli yedek parça envanter kontrolü.
PhD thesis, 2010

An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse.
Oper. Res. Lett., 2010


  Loading...