Dorota Kuchta

Orcid: 0000-0002-9747-0759

According to our database1, Dorota Kuchta authored at least 47 papers between 1996 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
Application of data envelopment analysis to IT project evaluation, with special emphasis on the choice of inputs and outputs in the context of the organization in question.
J. Inf. Telecommun., July, 2024

2023
A vector visualization of uncertainty complementing the traditional fuzzy approach with applications in project management.
Appl. Soft Comput., April, 2023

Project implementation scenario selection for sustainable project and product lifecycle management. Application of network data envelopment analysis.
Oper. Res. Decis., 2023

Fuzzy Vector Representation of Project Metrics' Target and Actual Values and Its Application to Project Management.
Proceedings of the Artificial Intelligence in HCI, 2023

Perception of the Fuzzy Number Indeterminacy Change in Vector and Triangle Representations - Implications for Graphical User Interface Design.
Proceedings of the Artificial Intelligence in HCI, 2023

Perception of vector and triangle representations of fuzzy number most possible value changes.
Proceedings of the 18th Conference on Computer Science and Intelligence Systems, 2023

2022
Critical Path for Projects with Activity Durations Modelled as Z-Fuzzy Numbers.
J. Multiple Valued Log. Soft Comput., 2022

Fuzzy modelling and control of project cash flows.
J. Intell. Fuzzy Syst., 2022

Uncertainty Occurrence in Projects and Its Consequences for Project Management.
Proceedings of the Computational Science - ICCS 2022, 2022

2021
Fuzzy weak link approach to the two-stage DEA.
RAIRO Oper. Res., 2021

Vector and Triangular Representations of Project Estimation Uncertainty: Effect of Gender on Usability.
Proceedings of the Computational Science - ICCS 2021, 2021

2020
Dependency beetween IT project success and the communication with project stakeholders - intuitionistic fuzzy sets approach.
J. Intell. Fuzzy Syst., 2020

Increasing earned value analysis efficiency for IT projects.
J. Decis. Syst., 2020

2019
Application of Fuzzy Sets to the Expert Estimation of Scrum-Based Projects.
Symmetry, 2019

Implementation of Scrum Retrospective in the Process of Improving Logistics Organization.
Proceedings of the Information Systems Architecture and Technology: Proceedings of 40th Anniversary International Conference on Information Systems Architecture and Technology - ISAT 2019, 2019

2018
Fuzzy Capital Budgeting for Projects Characterized by Step Type Fuzzy Intervals.
J. Multiple Valued Log. Soft Comput., 2018

Selection of IT projects to be implemented in an organisation to maximise their success probability.
J. Decis. Syst., 2018

2016
Application of Fuzzy Rules to the Decision Process in Crisis Management: The Case of the Silesian District in Poland.
Proceedings of the Intelligence Systems in Environmental Management: Theory and Applications, 2016

Conceptual model of working space for Agile (Scrum) project team.
J. Syst. Softw., 2016

Modified, Stakeholders Perspective based DEA Approach in IT and R&D Project Ranking.
Proceedings of the ICEIS 2016, 2016

The Use of the Generalised Knapsack Problem in Computer Aided Strategic Management.
Proceedings of the ICEIS 2016, 2016

Agile-Similar Approach Based on Project Crashing to Manage Research Projects.
Proceedings of the Enterprise Information Systems - 18th International Conference, 2016

Agile-similar Approach in Traditional Project Management - A Generalisation of the Crashing Model.
Proceedings of the ICEIS 2016, 2016

2015
Project Scheduling Maximizing the Fuzzy Net Present Value Influenced by the Decision Maker Attitude.
J. Multiple Valued Log. Soft Comput., 2015

Fuzzy Stage Dependent Travelling Salesman Problem with Networks as Nodes.
Proceedings of the Information Systems Architecture and Technology: Proceedings of 36th International Conference on Information Systems Architecture and Technology - ISAT 2015, 2015

Project Risk time Management - A Proposed Model and a Case Study in the Construction Industry.
Proceedings of the Conference on ENTERprise Information Systems/International Conference on Project MANagement/Conference on Health and Social Care Information Systems and Technologies, 2015

2014
Choice of Countermeasures in Project Risk Management Using Fuzzy Modelling.
Int. J. Comput. Commun. Control, 2014

A New Concept of Project Robust Schedule - Use of Buffers.
Proceedings of the Second International Conference on Information Technology and Quantitative Management, 2014

2013
Fuzzy Capital Budgeting - Fuzzy Bailout Payback Period and Fuzzy Accrual Accounting Rate of Return Methods.
J. Multiple Valued Log. Soft Comput., 2013

2011
A concept of a robust solution of a multicriterial linear programming problem.
Central Eur. J. Oper. Res., 2011

2010
Fuzzy Production and Operations Budgeting and Control.
Proceedings of the Production Engineering and Management under Fuzziness, 2010

The Use of Fuzzy Numbers in Practical Project Planning and Control.
Proceedings of the Fuzzy Optimization - Recent Advances and Applications, 2010

2009
Least Squares Method for L-R Fuzzy Variables.
Proceedings of the Fuzzy Logic and Applications, 8th International Workshop, 2009

2008
Fuzzy Rate of Return Analysis and Applications.
Proceedings of the Fuzzy Engineering Economics with Applications, 2008

Optimization with Fuzzy Present Worth Analysis and Applications.
Proceedings of the Fuzzy Engineering Economics with Applications, 2008

A modification of a solution concept of the linear programming problem with interval coefficients in the constraints.
Central Eur. J. Oper. Res., 2008

2007
Choice of the best alternative in case of a continuous set of states of nature-application of fuzzy numbers.
Fuzzy Optim. Decis. Mak., 2007

Outliers Detection in Selected Fuzzy Regression Models.
Proceedings of the Applications of Fuzzy Sets Theory, 2007

2003
Fuzzy pair-wise dominance and fuzzy indices: An evaluation of productive performance.
Eur. J. Oper. Res., 2003

User-tailored fuzzy relations between intervals.
Proceedings of the 3rd Conference of the European Society for Fuzzy Logic and Technology, 2003

Minimisation of the expected weighted number of jobs being late with fuzzy processing time in a one machine system.
Proceedings of the 3rd Conference of the European Society for Fuzzy Logic and Technology, 2003

2002
A generalisation of an algorithm solving the fuzzy multiple choice knapsack problem.
Fuzzy Sets Syst., 2002

2001
A new approach to fuzzy goal programming.
Proceedings of the 2nd International Conference in Fuzzy Logic and Technology, 2001

2000
Fuzzy capital budgeting.
Fuzzy Sets Syst., 2000

1998
Fuzzy integer transportation problem.
Fuzzy Sets Syst., 1998

An algorithm for solving bicriterial linear programmingproblems with parametrical coefficients in theobjective functions.
Ann. Oper. Res., 1998

1996
A concept of the optimal solution of the transportation problem with fuzzy cost coefficients.
Fuzzy Sets Syst., 1996


  Loading...