Dong Ho Park

Orcid: 0000-0003-1742-7978

According to our database1, Dong Ho Park authored at least 21 papers between 2000 and 2020.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2020
Warranty cost analysis for second-hand products under a two-stage repair-or-full refund policy.
Reliab. Eng. Syst. Saf., 2020

2018
Optimization of periodic preventive maintenance policy following the expiration of two-dimensional warranty.
Reliab. Eng. Syst. Saf., 2018

2016
A Generalized Age Replacement Policy for Systems Under Renewing Repair-Replacement Warranty.
IEEE Trans. Reliab., 2016

Hybrid kernel density estimation for discriminant analysis with information complexity and genetic algorithm.
Knowl. Based Syst., 2016

Optimal warranty policies considering repair service and replacement service under the manufacturer's perspective.
Ann. Oper. Res., 2016

2015
Cost optimization model following extended renewing two-phase warranty.
Comput. Ind. Eng., 2015

2013
Optimal post-warranty maintenance policy with repair time threshold for minimal repair.
Reliab. Eng. Syst. Saf., 2013

2012
Software Maintainability Prediction Model Based on Fuzzy Neural Network.
J. Multiple Valued Log. Soft Comput., 2012

2011
Evaluation of multi-tasking software system performance with consideration of module dependency.
J. Softw. Maintenance Res. Pract., 2011

An utility-based job scheduling algorithm for Cloud computing considering reliability factor.
Proceedings of the 2011 International Conference on Cloud and Service Computing, 2011

2010
System maintenance cost dependent on life cycle under renewing warranty policy.
Reliab. Eng. Syst. Saf., 2010

Software Reliability Modeling Considering Fault Correction Process.
IEICE Trans. Inf. Syst., 2010

2008
Optimization of cost and downtime for replacement model following the expiration of warranty.
Reliab. Eng. Syst. Saf., 2008

2007
Optimal Periodic Preventive Maintenance Schedules with Improvement Factors Depending on Number of Preventive Maintenances.
Asia Pac. J. Oper. Res., 2007

2005
Cost evaluation for an imperfect-repair model with random repair time.
Int. J. Syst. Sci., 2005

Evaluation of software availability for the imperfect software debugging model.
Int. J. Syst. Sci., 2005

2004
Sequential capacity determination of subnetworks in network performance analysis.
IEEE Trans. Reliab., 2004

Bootstrap confidence Intervals for steady-State Availability.
Asia Pac. J. Oper. Res., 2004

2003
Optimal maintenance policies during the post-warranty period.
Reliab. Eng. Syst. Saf., 2003

2001
An efficient method for evaluating network-reliability with variable link-capacities.
IEEE Trans. Reliab., 2001

2000
Cost minimization for periodic maintenance policy of a system subject to slow degradation.
Reliab. Eng. Syst. Saf., 2000


  Loading...