Dimitrios C. Tselios

Orcid: 0000-0002-5840-5858

According to our database1, Dimitrios C. Tselios authored at least 14 papers between 2008 and 2024.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Can Reservoirs Combine Flood Protection and Irrigation? A Case Study for Larissa City, Greece.
Oper. Res. Forum, March, 2024

Defining the "Smart Hospital": A Literature Review.
Proceedings of the Good Practices and New Perspectives in Information Systems and Technologies, 2024

2019
Distributed and multi-core version of k-means algorithm.
Int. J. Grid Util. Comput., 2019

2017
Combining Distributed and Multi-core Programming Techniques to Increase the Performance of K-Means Algorithm.
Proceedings of the 26th IEEE International Conference on Enabling Technologies: Infrastructure for Collaborative Enterprises, 2017

2016
Phased Method for Solving Multi-Objective MPM Job Shop Scheduling Problem.
Int. J. Monit. Surveillance Technol. Res., 2016

Parallelizing DBSCaN Algorithm Using MPI.
Proceedings of the 25th IEEE International Conference on Enabling Technologies: Infrastructure for Collaborative Enterprises, 2016

2015
Integrated intelligent method for solving multi-objective MPM job shop scheduling problem.
Proceedings of the 6th International Conference on Information, 2015

A dynamic programming algorithm for optimizing the financial return of software projects.
Proceedings of the 6th International Conference on Information, 2015

A Dynamic Programming Approach for Solving the IFM Based Project Scheduling Problem.
Proceedings of the 41st Euromicro Conference on Software Engineering and Advanced Applications, 2015

2013
Multiple project portfolio scheduling using recurrent neural networks.
Int. J. Simul. Process. Model., 2013

RNN Modelling for Bi-Objective MPM Job Shop Scheduling Problem.
Proceedings of the Fifth International Conference on Computational Intelligence, 2013

2012
The Weighted Tardiness as Objective Function of a RNN Model for the Job Scheduling Problem.
Proceedings of the Sixth UKSim/AMSS European Symposium on Computer Modeling and Simulation, 2012

Project Portfolio: A Job Scheduling Approach.
Proceedings of the Sixth International Conference on Complex, 2012

2008
Quality Interplay in Regular vs. Irregular Grid Topologies.
Proceedings of the 17th IEEE International Workshops on Enabling Technologies: Infrastructures for Collaborative Enterprises, 2008


  Loading...