Dieter Debels

According to our database1, Dieter Debels authored at least 7 papers between 2005 and 2008.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2008
An evaluation of the adequacy of project network generators with systematically sampled networks.
Eur. J. Oper. Res., 2008

The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects.
Comput. Ind. Eng., 2008

2007
The discrete time/cost trade-off problem: extensions and heuristic procedures.
J. Sched., 2007

A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem.
Oper. Res., 2007

2006
A hybrid scatter search/electromagnetism meta-heuristic for project scheduling.
Eur. J. Oper. Res., 2006

2005
A Bi-population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem.
Proceedings of the Computational Science and Its Applications, 2005

The Electromagnetism Meta-heuristic Applied to the Resource-Constrained Project Scheduling Problem.
Proceedings of the Artificial Evolution, 2005


  Loading...