David Lemoine

Orcid: 0000-0001-6705-6138

According to our database1, David Lemoine authored at least 14 papers between 2008 and 2024.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
A robust LP-based approach for a dynamic surgical case scheduling problem with sterilisation constraints.
Int. J. Prod. Res., 2024

2021
Tactical Planning and Predictive Maintenance: Towards an Integrated Model Based on ε-reliability.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Put Option Contracts in Newsvendor Model with Bankruptcy Risk.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

An EOQ-Based Lot Sizing Model with Working Capital Requirements Financing Cost.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Hybridization of Mixed-Integer Linear Program and Discrete Event Systems for Robust Scheduling on Parallel Machines.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

2020
Vers une intégration décisionnelle en planification de production.
, 2020

2019
Surgical case scheduling with sterilising activity constraints.
Int. J. Prod. Res., 2019

2018
Integrated dynamic single item lot-sizing and quality inspection planning.
Int. J. Prod. Res., 2018

2015
Dynamic cluster in particle swarm optimization algorithm.
Nat. Comput., 2015

2014
Integration of Maintenance in the Tactical Production Planning Process under Feasibility Constraint.
Proceedings of the Advances in Production Management Systems. Innovative and Knowledge-Based Production Management in a Global-Local World, 2014

Integration approaches of forecasting methods selection with inventory management indicators in the case of spare parts supply chain.
Proceedings of the 2nd International Conference on Logistics Operations Management, 2014

2011
Discrete Particle Swarm Optimization for the Multi-Level Lot-Sizing Problem.
Int. J. Appl. Metaheuristic Comput., 2011

2010
Metaheuristic for the capacitated lot-sizing problem: a software tool for MPS elaboration.
Int. J. Math. Oper. Res., 2010

2008
Modèles génériques et méthodes de résolution pour la planification tactique mono-site et multi-site. (Generic models and resolution methods for tactical planning in mono-site and multi-site context).
PhD thesis, 2008


  Loading...