Chung-Yee Lee
Orcid: 0000-0002-7006-2974
According to our database1,
Chung-Yee Lee
authored at least 71 papers
between 1986 and 2021.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2021
Transp. Sci., 2021
2020
Coordinating Pricing and Empty Container Repositioning in Two-Depot Shipping Systems.
Transp. Sci., 2020
Manuf. Serv. Oper. Manag., 2020
2019
A carrier-shipper contract under asymmetric information in the ocean transport industry.
Ann. Oper. Res., 2019
2018
IEEE Trans Autom. Sci. Eng., 2018
Oper. Res., 2018
2017
2016
Multiobjective Approaches for the Ship Stowage Planning Problem Considering Ship Stability and Container Rehandles.
IEEE Trans. Syst. Man Cybern. Syst., 2016
Eur. J. Oper. Res., 2016
2015
Transp. Sci., 2015
2013
Oper. Res., 2013
Eur. J. Oper. Res., 2013
2011
Technical Note - Optimal Control of an Assembly System with Multiple Stages and Multiple Demand Classes.
Oper. Res., 2011
2010
Oper. Res. Lett., 2010
2009
Oper. Res. Lett., 2009
Oper. Res. Lett., 2009
Note - Optimal Component Acquisition for a Single-Product, Single-Demand Assemble-to-Order Problem with Expediting.
Manuf. Serv. Oper. Manag., 2009
Optimal transportation policies for production/inventory systems with an unreliable and a reliable carrier.
J. Glob. Optim., 2009
Eur. J. Oper. Res., 2009
2008
Dynamic lot-sizing problem with demand time windows and container-based transportation cost.
Optim. Lett., 2008
Eur. J. Oper. Res., 2008
2007
Outbound shipment mode considerations for integrated inventory and delivery lot-sizing decisions.
Oper. Res. Lett., 2007
2006
J. Sched., 2006
Oper. Res. Lett., 2006
Optimal Component Stocking Policy for Assemble-to-Order Systems with Lead-Time-Dependent Component and Product Pricing.
Manag. Sci., 2006
Inventory and Production Decisions for an Assemble-to-Order System with Uncertain Demand and Limited Assembly Capacity.
Oper. Res., 2006
A comparison of outbound dispatch policies for integrated inventory and transportation decisions.
Eur. J. Oper. Res., 2006
2005
Eur. J. Oper. Res., 2005
2004
Proceedings of the Handbook of Scheduling - Algorithms, Models, and Performance Analysis., 2004
Oper. Res. Lett., 2004
J. Glob. Optim., 2004
2003
A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse.
Oper. Res., 2003
2002
2001
Eur. J. Oper. Res., 2001
Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases.
Ann. Oper. Res., 2001
2000
Multiprocessor task scheduling to minimize the maximum tardiness and the total completion time.
IEEE Trans. Robotics Autom., 2000
A note on "parallel machine scheduling with non-simultaneous machine available time".
Discret. Appl. Math., 2000
1999
Eur. J. Oper. Res., 1999
1997
Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint.
Oper. Res. Lett., 1997
Letter to the Editor - Addendum to "Efficient Algorithms for Scheduling Semiconductor Burn-In Operations.
Oper. Res., 1997
1996
1995
INFORMS J. Comput., 1995
1994
A dynamic programming algorithm for dynamic lot size models with piecewise linear costs.
J. Glob. Optim., 1994
A new dynamic programming algorithm for the single item capacitated dynamic lot size model.
J. Glob. Optim., 1994
1993
Oper. Res. Lett., 1993
INFORMS J. Comput., 1993
Capacitated Two-Parallel Machines Scheduling to Minimize Sum of Job Completion Times.
Discret. Appl. Math., 1993
1992
A new dynamic programming algorithm for the parallel machines total weighted completion time problem.
Oper. Res. Lett., 1992
Oper. Res., 1992
Acta Informatica, 1992
1991
Stop Probability and Delay Estimations at Low Volumes for Semi-Actuated Traffic Signals.
Transp. Sci., 1991
Discret. Appl. Math., 1991
Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date.
Comput. Oper. Res., 1991
1989
SIAM J. Comput., 1989
1988
1986
Math. Oper. Res., 1986