Christos Koulamas

Orcid: 0000-0001-7172-0628

According to our database1, Christos Koulamas authored at least 135 papers between 1992 and 2024.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Erratum to "Competitive Two-Agent Scheduling and Its Applications".
Oper. Res., 2024

Towards Integration of EPANET and ASM2S To Enhance Security in Water Distribution Systems.
Proceedings of the 29th IEEE International Conference on Emerging Technologies and Factory Automation, 2024

2023
Simultaneous minimisation of mean and variation of waiting times in a two-stage proportionate blocking flow shop.
J. Oper. Res. Soc., November, 2023

A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems.
Eur. J. Oper. Res., 2023

Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection.
Eur. J. Oper. Res., 2023

Detecting Health & Safety Hazards through AI and Edge Computing on Mobile Devices.
Proceedings of the 12th Mediterranean Conference on Embedded Computing, 2023

A Design Approach and Prototype Implementation for Factory Monitoring Based on Virtual and Augmented Reality at the Edge of Industry 4.0.
Proceedings of the 21st IEEE International Conference on Industrial Informatics, 2023

Towards Run-Time Security Monitoring of Distributed Industrial Control Systems.
Proceedings of the 28th IEEE International Conference on Emerging Technologies and Factory Automation, 2023

2022
Flow shop scheduling with two distinct job due dates.
Comput. Ind. Eng., 2022

Design and Evaluation of an Indoor Positioning System based on Mobile Devices.
Proceedings of the 11th Mediterranean Conference on Embedded Computing, 2022

Open-Source Integrated Simulation Framework for Cooperative Autonomous Vehicles.
Proceedings of the 11th Mediterranean Conference on Embedded Computing, 2022

2021
New results for scheduling to minimize tardiness on one machine with rejection and related problems.
J. Sched., 2021

New results for minimising variation of flow time in two-machine proportionate no-wait flow shops.
Int. J. Prod. Res., 2021

The no-wait flow shop with rejection.
Int. J. Prod. Res., 2021

Process based Machine Learning for Energy Optimization in Industrial Enterprises.
Proceedings of the 10th Mediterranean Conference on Embedded Computing, 2021

Design and Performance Evaluation of an Embedded EDHOC Module.
Proceedings of the 10th Mediterranean Conference on Embedded Computing, 2021

2020
Privacy Preservation in Industrial IoT via Fast Adaptive Correlation Matrix Completion.
IEEE Trans. Ind. Informatics, 2020

Real-Time Sensor Networks and Systems for the Industrial IoT: What Next?
Sensors, 2020

Three-stage ordered flow shops with either synchronous flow, blocking or no-idle machines.
J. Sched., 2020

Cultural and Heritage Site Defect Detection via 3D Saliency Map Extraction.
ERCIM News, 2020

Analysis of flow shop scheduling anomalies.
Eur. J. Oper. Res., 2020

The proportionate flow shop total tardiness problem.
Eur. J. Oper. Res., 2020

A Saliency Aware CNN-Based 3D Model Simplification and Compression Framework for Remote Inspection of Heritage Sites.
IEEE Access, 2020

Low Latency and Low Cost Smart Embedded Seismograph for Early Warning IoT Applications.
Proceedings of the 9th Mediterranean Conference on Embedded Computing, 2020

Decentralized, Secure and Cognitive Architecture for Automotive CyberPhysical System of Systems.
Proceedings of the 9th Mediterranean Conference on Embedded Computing, 2020

2019
The evolution of schematic representations of flow shop scheduling problems.
J. Sched., 2019

The two-stage no-wait/blocking proportionate super shop scheduling problem.
Int. J. Prod. Res., 2019

Components and Tools for Large Scale, Complex Cyber-Physical Systems Based on Industrial Internet of Things Technologies.
ERCIM News, 2019

New results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectives.
Eur. J. Oper. Res., 2019

Introducing Hardware-Based Intelligence and Reconfigurability on Industrial IoT Edge Nodes.
IEEE Des. Test, 2019

Enabling the human in the loop: Linked data and knowledge in industrial cyber-physical systems.
Annu. Rev. Control., 2019

Sparse modeling and optimization tools for energy efficient and reliable IoT.
Proceedings of the First International Conference on Societal Automation, 2019

Evaluating CoAP End to End Security for Constrained Wireless Sensor Networks.
Proceedings of the 10th IFIP International Conference on New Technologies, 2019

Robust and Efficient Privacy Preservation in Industrial IoT via correlation completion and tracking.
Proceedings of the 17th IEEE International Conference on Industrial Informatics, 2019

Secure and Safe IIoT Systems via Machine and Deep Learning Approaches.
Proceedings of the Security and Quality in Cyber-Physical Systems Engineering, 2019

Design and Run-Time Aspects of Secure Cyber-Physical Systems.
Proceedings of the Security and Quality in Cyber-Physical Systems Engineering, 2019

2018
Resale price maintenance in supply chains with general multiplicative demand.
Oper. Res. Lett., 2018

The price-setting newsvendor with nonlinear salvage revenue and shortage cost.
Oper. Res. Lett., 2018

Competition in two-tier serial and assembly supply chains with general consumer utility functions.
Int. J. Prod. Res., 2018

The price-setting newsvendor problem with nonnegative linear additive demand.
Eur. J. Oper. Res., 2018

Cyber-Physical Systems and Digital Twins in the Industrial Internet of Things [Cyber-Physical Systems].
Computer, 2018

New index priority rules for no-wait flow shops.
Comput. Ind. Eng., 2018

Verification and validation of a simulation model for energy use in buildings.
Proceedings of the 14th IEEE International Workshop on Factory Communication Systems, 2018

IoT Integration for Adaptive Manufacturing.
Proceedings of the 21st IEEE International Symposium on Real-Time Distributed Computing, 2018

Precision Robustness Testing of a Simulation Model for Energy Use in Buildings.
Proceedings of the 23rd IEEE International Conference on Emerging Technologies and Factory Automation, 2018

2017
Minimizing the number of tardy jobs in two-machine settings with common due date.
J. Comb. Optim., 2017

A constraint generation approach for two-machine shop problems with jobs selection.
Eur. J. Oper. Res., 2017

On the dominance of permutation schedules for some ordered and proportionate flow shop problems.
Comput. Ind. Eng., 2017

Common due date assignment with generalized earliness/tardiness penalties.
Comput. Ind. Eng., 2017

Sensitivity analysis of medical centers energy consumption with EnergyPlus.
Proceedings of the 22nd IEEE International Conference on Emerging Technologies and Factory Automation, 2017

Validation of a monthly quasi-steady-state simulation model for the energy use in buildings.
Proceedings of the 22nd IEEE International Conference on Emerging Technologies and Factory Automation, 2017

Choosing measures for energy efficient hospital buildings.
Proceedings of the 22nd IEEE International Conference on Emerging Technologies and Factory Automation, 2017

Production process adaptation to IoT triggered manufacturing resource failure events.
Proceedings of the 22nd IEEE International Conference on Emerging Technologies and Factory Automation, 2017

2016
Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project.
Sensors, 2016

New structural properties of supply chains with price-only contracts.
Oper. Res. Lett., 2016

The proportionate two-machine no-wait job shop scheduling problem.
Eur. J. Oper. Res., 2016

A High Speed Scalar Multiplier for Binary Edwards Curves.
Proceedings of the Third Workshop on Cryptography and Security in Computing Systems, 2016

2015
A note on the complexity of scheduling problems with linear job deterioration.
J. Glob. Optim., 2015

Erratum - One Machine Sequencing to Minimize Total Tardiness: A Fourth Theorem for Emmons.
Oper. Res., 2015

The three-machine proportionate open shop and mixed shop minimum makespan problems.
Eur. J. Oper. Res., 2015

A note on scheduling problems with competing agents and earliness minimization objectives.
Eur. J. Oper. Res., 2015

Job selection in two-stage shops with ordered machines.
Comput. Ind. Eng., 2015

On the equivalence of single machine earliness/tardiness problems with job rejection.
Comput. Ind. Eng., 2015

Middleware approaches for wireless sensor networks based on current trends.
Proceedings of the 4th Mediterranean Conference on Embedded Computing, 2015

Experimental evaluation of the waspmote platform power consumption targeting ambient sensing.
Proceedings of the 4th Mediterranean Conference on Embedded Computing, 2015

Designing efficient elliptic Curve Diffie-Hellman accelerators for embedded systems.
Proceedings of the 2015 IEEE International Symposium on Circuits and Systems, 2015

Fault and Power Analysis Attack Resistant RNS based Edwards Curve Point Multiplication.
Proceedings of the Second Workshop on Cryptography and Security in Computing Systems, 2015

2014
The two-machine no-wait general and proportionate open shop makespan problem.
Eur. J. Oper. Res., 2014

A Constraint Generation Approach for the Two-Machine Flow Shop Problem with Jobs Selection.
Proceedings of the Combinatorial Optimization - Third International Symposium, 2014

2013
Two-tier equilibria for supply chains with a single manufacturer and multiple asymmetric retailers.
Oper. Res. Lett., 2013

On index priority sequencing rules for scheduling with time-dependent job processing times.
Oper. Res. Lett., 2013

The three-stage ordered flow shop problem with flexible stage ordering.
Comput. Ind. Eng., 2013

Design of a WSN software stack Synthesis Evaluation Module.
Proceedings of the IEEE 24th International Symposium on Personal, 2013

2012
A note on minimizing the sum of quadratic completion times on two identical parallel machines.
Inf. Process. Lett., 2012

Engineering Asset Lifecycle Optimal Management: WelCOM Approach to E-Maintenance.
ERCIM News, 2012

An O(n<sup>2</sup>) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines.
Eur. J. Oper. Res., 2012

Developing RFID-Based Systems for Security in Marine Transportations.
Proceedings of the 16th Panhellenic Conference on Informatics, PCI 2012, 2012

Wireless Sensor Network Technologies for Condition Monitoring of Industrial Assets.
Proceedings of the Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, 2012

In-tunnel mobile communications deployment of an heterogeneous WLAN-WiMAX wireless network.
Proceedings of the First International Conference on Future Generation Communication Technologies (FGST 2012), 2012

FPGA-based Design Approaches of Keccak Hash Function.
Proceedings of the 15th Euromicro Conference on Digital System Design, 2012

2011
A note on equilibria for two-tier supply chains with a single manufacturer and multiple retailers.
Oper. Res. Lett., 2011

A note on the classification of consumer demand functions with respect to retailer pass-through rates.
Eur. J. Oper. Res., 2011

2010
A faster algorithm for a due date assignment problem with tardy jobs.
Oper. Res. Lett., 2010

A modeling approach on the TelosB WSN platform power consumption.
J. Syst. Softw., 2010

Corrigendum to "A modeling approach on the TelosB WSN platform power consumption" [J. Syst. Software 83 (2010) 1355-1363].
J. Syst. Softw., 2010

A note on the effects of downstream efficiency on upstream pricing.
Eur. J. Oper. Res., 2010

A unified analysis for the single-machine scheduling problem with controllable and non-controllable variable job processing times.
Eur. J. Oper. Res., 2010

A note on single-machine scheduling with job-dependent learning effects.
Eur. J. Oper. Res., 2010

The single-machine total tardiness scheduling problem: Review and extensions.
Eur. J. Oper. Res., 2010

2009
A modified LPT algorithm for the two uniform parallel machine makespan minimization problem.
Eur. J. Oper. Res., 2009

A note on the proportionate flow shop with a bottleneck machine.
Eur. J. Oper. Res., 2009

A faster fully polynomial approximation scheme for the single-machine total tardiness problem.
Eur. J. Oper. Res., 2009

Experimental evaluation of a WSN platform power consumption.
Proceedings of the 23rd IEEE International Symposium on Parallel and Distributed Processing, 2009

2008
Single-machine scheduling with waiting-time-dependent due dates.
Eur. J. Oper. Res., 2008

Single-machine scheduling problems with past-sequence-dependent setup times.
Eur. J. Oper. Res., 2008

An improved delayed-start LPT algorithm for a partition problem on two identical parallel machines.
Eur. J. Oper. Res., 2008

2007
A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines.
Eur. J. Oper. Res., 2007

Single-machine and two-machine flowshop scheduling with general learning functions.
Eur. J. Oper. Res., 2007

A framework for the implementation of adaptive streaming systems.
Proceedings of the WMuNeP'07, 2007

2006
A note on makespan minimization in two-stage flexible flow shops with uniform machines.
Eur. J. Oper. Res., 2006

Flexible flow shop scheduling with uniform parallel machines.
Eur. J. Oper. Res., 2006

Performance guarantees for flowshop heuristics to minimize makespan.
Eur. J. Oper. Res., 2006

A Newsvendor Problem with Revenue Sharing and Channel Coordination.
Decis. Sci., 2006

Measurements and modeling of resource consumption in wireless video streaming: the decoder case.
Proceedings of the WMuNeP'06, 2006

2005
A correction to "Single machine scheduling with release times, deadlines and tardiness objectives" [EJOR 133 (2001) 447-453].
Eur. J. Oper. Res., 2005

2004
A methodology for the development of distributed real-time control applications with focus on task allocation in heterogeneous systems.
IEEE Trans. Ind. Electron., 2004

Using cut-through forwarding to retain the real-time properties of Profibus over hybrid wired/wireless architectures.
IEEE Trans. Ind. Electron., 2004

Concurrent flowshop scheduling to minimize makespan.
Eur. J. Oper. Res., 2004

Makespan minimization on uniform parallel machines with release times.
Eur. J. Oper. Res., 2004

Scheduling Three-Operation Jobs in a Two-Machine Flow Shop to Minimize Makespan.
Ann. Oper. Res., 2004

2003
Real-time performance of cut-through forwarding in hybrid wired/wireless industrial networks.
Proceedings of 9th IEEE International Conference on Emerging Technologies and Factory Automation, 2003

2002
Assembly-Line Scheduling with Concurrent Operations and Parallel Machines.
INFORMS J. Comput., 2002

2001
Real-Time Vision-Based System for Textile Fabric Inspection.
Real Time Imaging, 2001

A note on weighted completion time minimization in a flexible flow shop.
Oper. Res. Lett., 2001

A note on scheduling flowshops with flexible stage ordering.
Eur. J. Oper. Res., 2001

Single machine scheduling with release times, deadlines and tardiness objectives.
Eur. J. Oper. Res., 2001

The three-stage assembly flowshop scheduling problem.
Comput. Oper. Res., 2001

An Object-Oriented Framework for the Development of Distributed Industrial Process Measurement and Control Systems.
Proceedings of the ICEIS 2001, 2001

Delay performance of radio physical layer technologies as candidates for wireless extensions to industrial networks.
Proceedings of 8th IEEE International Conference on Emerging Technologies and Factory Automation, 2001

2000
Scheduling on uniform parallel machines to minimize maximum lateness.
Oper. Res. Lett., 2000

Flow shop and open shop scheduling with a critical machine and two operations per job.
Eur. J. Oper. Res., 2000

Open shop scheduling with makespan and total completion time criteria.
Comput. Oper. Res., 2000

Efficient System Modeling for Complex Real-Time Industrial Networks using the ACCORD/UML Methodology.
Proceedings of the Architecture and Design of Distributed Embedded Systems, 2000

1999
Throughput‐dependent periodic maintenance policiesfor general production units.
Ann. Oper. Res., 1999

Defect detection and classification on web textile fabric using multiresolution decomposition and neural networks.
Proceedings of the 6th IEEE International Conference on Electronics, Circuits and Systems, 1999

1998
A new constructive heuristic for the flowshop scheduling problem.
Eur. J. Oper. Res., 1998

On the complexity of two-machine flowshop problems with due date related objectives.
Eur. J. Oper. Res., 1998

A guaranteed accuracy shifting bottleneck algorithm for the two-machine flowshop total tardiness problem.
Comput. Oper. Res., 1998

Part selection and tool allocation in discrete parts manufacturing.
Ann. Oper. Res., 1998

1997
Open Shop Scheduling with Maximal Machines.
Discret. Appl. Math., 1997

1996
A note on finite replenishment inventory systems with continuous deterministic demand.
Int. J. Syst. Sci., 1996

Scheduling two parallel semiautomatic machines to minimize machine interference.
Comput. Oper. Res., 1996

Machining economics with phase-type distributed tool lives and periodic maintenance control.
Comput. Oper. Res., 1996

1994
The Total Tardiness Problem: Review and Extensions.
Oper. Res., 1994

1992
A stochastic model for a machining cell with tool failure and tool replacement considerations.
Comput. Oper. Res., 1992


  Loading...