Chris Beadle

According to our database1, Chris Beadle authored at least 3 papers between 2011 and 2017.

Collaborative distances:
  • Dijkstra number2 of six.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2017
Benchmark Pre-Production Practice in Manufacturing Engineering.
Proceedings of the Transdisciplinary Engineering: A Paradigm Shift, 2017

2011
Planning Manufacturing in a Concurrent Engineering Environment: A Case Study.
Proceedings of the Improving Complex Systems Today, 2011

Value Stream Analysis of Manufacturing Engineering New Product Introduction Processes.
Proceedings of the Improving Complex Systems Today, 2011


  Loading...