Changtao Lai

According to our database1, Changtao Lai authored at least 3 papers between 2011 and 2019.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2019
A Multi-Agent Optimization Method for Preemptive Resource-Constrained Project Scheduling.
Int. J. Inf. Technol. Proj. Manag., 2019

2015
Hybrid particle swarm optimization for preemptive resource-constrained project scheduling.
Neurocomputing, 2015

2011
Particle swarm optimization for preemptive project scheduling with resource constraints.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011


  Loading...