Behdin Vahedi Nouri

Orcid: 0000-0002-6568-6782

According to our database1, Behdin Vahedi Nouri authored at least 17 papers between 2015 and 2024.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Production scheduling in a reconfigurable manufacturing system benefiting from human-robot collaboration.
Int. J. Prod. Res., February, 2024

An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints.
Int. J. Prod. Res., 2024

A Flexible Job Shop Scheduling Problem Involving Reconfigurable Machine Tools Under Industry 5.0.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments, 2024

2023
A bi-objective home care routing and scheduling problem considering patient preference and soft temporal dependency constraints.
Eng. Appl. Artif. Intell., March, 2023

Bi-objective collaborative electric vehicle routing problem: mathematical modeling and matheuristic approach.
J. Ambient Intell. Humaniz. Comput., 2023

A Constraint Programming Model for a Reconfigurable Job Shop Scheduling Problem with Machine Availability.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures, 2023

2022
A hybrid learning-based meta-heuristic algorithm for scheduling of an additive manufacturing system consisting of parallel SLM machines.
Int. J. Prod. Res., 2022

2021
Incorporating order acceptance, pricing and equity considerations in the scheduling of cloud manufacturing systems: matheuristic methods.
Int. J. Prod. Res., 2021

Simultaneous waterway scheduling, berth allocation, and quay crane assignment: A novel matheuristic approach.
Int. J. Prod. Res., 2021

Integrated Workforce Allocation and Scheduling in a Reconfigurable Manufacturing System Considering Cloud Manufacturing.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

2020
Scheduling of human-robot collaboration in assembly of printed circuit boards: a constraint programming approach.
Int. J. Comput. Integr. Manuf., 2020

A new weighted distance-based approximation methodology for flow shop scheduling group decisions under the interval-valued fuzzy processing time.
Appl. Soft Comput., 2020

A Bi-objective Scheduling Model for Additive Manufacturing with Multiple Materials and Sequence-Dependent Setup Time.
Proceedings of the Advances in Production Management Systems. Towards Smart and Digital Manufacturing, 2020

2017
A new approach to cooperative competition in facility location problems: Mathematical formulations and an approximation algorithm.
Comput. Oper. Res., 2017

2016
Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops.
RAIRO Oper. Res., 2016

2015
Two hybrid tabu search-firefly algorithms for the capacitated job shop scheduling problem with sequence-dependent setup cost.
Int. J. Comput. Integr. Manuf., 2015

Redundancy Resource Allocation for Reliable Project Scheduling: A Game-theoretical Approach.
Proceedings of the Conference on ENTERprise Information Systems/International Conference on Project MANagement/Conference on Health and Social Care Information Systems and Technologies, 2015


  Loading...