Baris Tan
Orcid: 0000-0002-2584-1020
According to our database1,
Baris Tan
authored at least 33 papers
between 1998 and 2025.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2025
Asymptotically optimal energy consumption and inventory control in a make-to-stock manufacturing system.
Eur. J. Oper. Res., 2025
2024
Simultaneous control of multiple machines for energy efficiency: a simulation-based approach.
Int. J. Prod. Res., February, 2024
Energy-efficient production control of a make-to-stock system with buffer- and time-based policies.
Int. J. Prod. Res., 2024
A sample path-based method for the digital twin prediction update synchronization problem of unreliable production lines.
Proceedings of the 20th IEEE International Conference on Automation Science and Engineering, 2024
2023
Eur. J. Oper. Res., August, 2023
2022
Supervised learning-based approximation method for single-server open queueing networks with correlated interarrival and service times.
Int. J. Prod. Res., 2022
Supervised-learning-based approximation method for multi-server queueing networks under different service disciplines with correlated interarrival and service times.
Int. J. Prod. Res., 2022
A machine learning approach for implementing data-driven production control policies.
Int. J. Prod. Res., 2022
Proceedings of the Winter Simulation Conference, 2022
2021
Eur. J. Oper. Res., 2021
2020
2019
Int. J. Prod. Res., 2019
Purchasing, production, and sales strategies for a production system with limited capacity, fluctuating sales and purchasing prices.
IISE Trans., 2019
2016
Optimal selection of energy efficiency measures for energy sustainability of existing buildings.
Comput. Oper. Res., 2016
2015
Ann. Oper. Res., 2015
2012
Agricultural planning of annual plants under demand, maturation, harvest, and yield risk.
Eur. J. Oper. Res., 2012
2011
Ann. Oper. Res., 2011
Ann. Oper. Res., 2011
2008
2005
A multiperiod stochastic production planning and sourcing problem with service level constraints.
OR Spectr., 2005
Stochastic models for the design, coordination, and control of manufacturing systems.
OR Spectr., 2005
2004
Production and Subcontracting Strategies for Manufacturers with Limited Capacity and Volatile Demand.
Ann. Oper. Res., 2004
2002
IEEE Trans. Autom. Control., 2002
Markov chain test for time dependence and homogeneity: An analytical and empirical evaluation.
Eur. J. Oper. Res., 2002
2000
Modelling and scheduling of an asynchronous cyclic production line with multiple parts.
J. Oper. Res. Soc., 2000
Ann. Oper. Res., 2000
1999
Eur. J. Oper. Res., 1999
1998
J. Oper. Res. Soc., 1998
A Stochastic Model of Vessel Casualties Resulting from Oil Tanker Traffic Through Narrow Waterways.
Proceedings of the 12<sup>th</sup> European Simulation Multiconference - Simulation, 1998