Avital Lann

According to our database1, Avital Lann authored at least 3 papers between 1996 and 2003.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2003
A note on the maximum number of on-time jobs on parallel identical machines.
Comput. Oper. Res., 2003

1998
Asymptotic optimality in probability of a heuristic schedule for open shops with job overlaps.
Oper. Res. Lett., 1998

1996
Single machine scheduling to minimize the number of early and tardy jobs.
Comput. Oper. Res., 1996


  Loading...