2021
Extended failure mode and effect analysis approach based on hesitant fuzzy linguistic Z-numbers for risk prioritisation of nuclear power equipment failures.
J. Intell. Fuzzy Syst., 2021

2020
Supplier Selection in the Nuclear Power Industry with an Integrated ANP-TODIM Method under Z-Number Circumstances.
Symmetry, 2020