UM-GAN: Underground mine GAN for underground mine low-light image enhancement.
IET Image Process., June, 2024
A two-stage memetic algorithm for energy-efficient flexible job shop scheduling by means of decreasing the total number of machine restarts.
Swarm Evol. Comput., 2022
An effective algorithm for flexible assembly job-shop scheduling with tight job constraints.
Int. Trans. Oper. Res., 2022
A combinatorial evolutionary algorithm for unrelated parallel machine scheduling problem with sequence and machine-dependent setup times, limited worker resources and learning effect.
Expert Syst. Appl., 2021
Multi-objective evolutionary algorithms with heuristic decoding for hybrid flow shop scheduling problem with worker constraint.
Expert Syst. Appl., 2021
Energy-efficient production scheduling through machine on/off control during preventive maintenance.
Eng. Appl. Artif. Intell., 2021
Optimal production decisions for remanufacturing end-of-life products under quality uncertainty and a carbon cap-and-trade policy.
Comput. Ind. Eng., 2021
A new unrelated parallel machine scheduling problem with tool changes to minimise the total energy consumption.
Int. J. Prod. Res., 2020
Remanufacturing-oriented process planning and scheduling: mathematical modelling and evolutionary optimisation.
Int. J. Prod. Res., 2020
An efficient memetic algorithm for distributed flexible job shop scheduling problem with transfers.
Expert Syst. Appl., 2020
Energy-efficient flexible flow shop scheduling with worker flexibility.
Expert Syst. Appl., 2020