2024
A robust optimization model for software development costs considering time value of money.
J. Softw. Evol. Process., July, 2024
2022
Monitoring logistic profiles in phase I using robust cluster-based method.
Qual. Reliab. Eng. Int., 2022
Monitoring multistage multivariate therapeutic processes using risk-adjusted model-based group multivariate EWMA control chart.
Qual. Reliab. Eng. Int., 2022
Two-dimensional wavelet based statistical monitoring of image data.
Qual. Reliab. Eng. Int., 2022
R-number Cognitive Map Method for Modeling Problems in Uncertainty and Risky Environment.
Int. J. Fuzzy Syst., 2022
2021
GLM profile monitoring using robust estimators.
Qual. Reliab. Eng. Int., 2021
Monitoring therapeutic processes using risk-adjusted multivariate Tukey's CUSUM control chart.
Qual. Reliab. Eng. Int., 2021
A nonparametric change detection approach in social networks.
Qual. Reliab. Eng. Int., 2021
2019
Detecting outbreaks in temporally dependent networks.
Qual. Reliab. Eng. Int., 2019
The extent of EFQM effectiveness in routine and non-routine organizations based on multivariate techniques: an empirical study.
Oper. Res., 2019
2018
An overview of dynamic anomaly detection in social networks via control charts.
Qual. Reliab. Eng. Int., 2018
Performance evaluation of EWMA and CUSUM control charts to detect anomalies in social networks using average and standard deviation of degree measures.
Qual. Reliab. Eng. Int., 2018
2017
Re-evaluation of the VSI- X¯ chart performance with estimated parameters.
Qual. Reliab. Eng. Int., 2017
Statistical process monitoring via image data using wavelets.
Qual. Reliab. Eng. Int., 2017
Using independent component analysis to monitor 2-D geometric specifications.
Qual. Reliab. Eng. Int., 2017
2016
Reliability and Maintenance Models for a Competing-Risk System Subjected to Random Usage.
IEEE Trans. Reliab., 2016
System Reliability with Multiple Failure Modes and Time Scales.
Qual. Reliab. Eng. Int., 2016
EWMA Control Chart Performance with Estimated Parameters under Non-normality.
Qual. Reliab. Eng. Int., 2016
A New Approach in Capability Analysis of Processes Monitored by a Simple Linear Regression Profile.
Qual. Reliab. Eng. Int., 2016
Change Point Estimation in the Mean of Multivariate Linear Profiles with No Change Type Assumption via Dynamic Linear Model.
Qual. Reliab. Eng. Int., 2016
Customer credit scoring using a hybrid data mining approach.
Kybernetes, 2016
2015
Phase II Monitoring of Geometric Profiles.
Commun. Stat. Simul. Comput., 2015
Change Point Estimation of Multivariate Linear Profiles Under Linear Drift.
Commun. Stat. Simul. Comput., 2015
2014
Economic and Economic-Statistical Designs of Phase II Profile Monitoring.
Qual. Reliab. Eng. Int., 2014
Functional Process Capability Indices for Circular Profile.
Qual. Reliab. Eng. Int., 2014
Reliability-based robust design optimization: A general methodology using genetic algorithm.
Comput. Ind. Eng., 2014
2013
Phase II Monitoring of Nonlinear Profile Variance Using Wavelet.
Qual. Reliab. Eng. Int., 2013
A Copula Markov CUSUM Chart for Monitoring the Bivariate Auto-correlated Binary Observations.
Qual. Reliab. Eng. Int., 2013
2012
Monitoring Two Dependent Process Steps Using Special Variable Sample Sizes and Sampling Intervals Cause-Selecting Control Charts.
Qual. Reliab. Eng. Int., 2012
Profile Monitoring Using Nonparametric Bootstrap <i>T</i> <sup>2</sup> Control Chart.
Commun. Stat. Simul. Comput., 2012
A case-based reasoning system development for statistical process control: Case representation and retrieval.
Comput. Ind. Eng., 2012
2011
Effect of non-normality on the monitoring of simple linear profiles.
Qual. Reliab. Eng. Int., 2011
Phase II monitoring of multivariate multiple linear regression profiles.
Qual. Reliab. Eng. Int., 2011
An integrated model based on statistical process control and maintenance.
Comput. Ind. Eng., 2011
An EWMA -based method for monitoring polytomous logistic profiles.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011
2010
Statistical monitoring of multivariate multiple linear regression profiles in phase I with calibration application.
Qual. Reliab. Eng. Int., 2010
Phase II monitoring of multivariate simple linear profiles.
Comput. Ind. Eng., 2010
2009
Identifying the period of a step change in high-yield processes.
Qual. Reliab. Eng. Int., 2009
Estimating the change point of a normal process mean with a monotonic change.
Qual. Reliab. Eng. Int., 2009
Simple linear profiles monitoring in the presence of within profile autocorrelation.
Comput. Ind. Eng., 2009
Robust Parameter Design Using the Weighted Metric Method - The Case of 'the Smaller the Better'.
Int. J. Appl. Math. Comput. Sci., 2009
2008
A general framework for multiresponse optimization problems based on goal programming.
Eur. J. Oper. Res., 2008
2007
On the conditional decision procedure for high yield processes.
Comput. Ind. Eng., 2007
2006
Effect of Autocorrelation on Performance of the MCUSUM Control Chart.
Qual. Reliab. Eng. Int., 2006