2016
Integrated Planning for Multiple Types of Locomotive Work Facilities Under Location, Routing, and Inventory Considerations.
Interfaces, 2016

Optimizing Location and Capacity for Multiple Types of Locomotive Maintenance Shops.
Comput. Aided Civ. Infrastructure Eng., 2016

2013
Optimal routing and scheduling of periodic inspections in large-scale railroad networks.
J. Rail Transp. Plan. Manag., 2013

2011
A Heuristic Approach to the Railroad Track Maintenance Scheduling Problem.
Comput. Aided Civ. Infrastructure Eng., 2011

2007
A Simulation/Optimization Framework for Locomotive Planning.
Proceedings of the ATMOS 2007, 2007