Electron beam induced carbon deposition using hydrocarbon contamination for XTEM analysis.
Microelectron. Reliab., 2010
An exact algorithm for a cross-docking supply chain network design problem.
J. Oper. Res. Soc., 2008
Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed.
Eur. J. Oper. Res., 2008
Receiver set partitioning and sequencing for multicasting traffic in a WDM lightwave single-hop network.
J. Oper. Res. Soc., 2004
Integrated service network design for a cross-docking supply chain network.
J. Oper. Res. Soc., 2003
Branch-and-price algorithm for a combined problem of virtual path establishment and traffic packet routing in a layered communication network.
J. Oper. Res. Soc., 2003
Minimizing makespan on a single burn-in oven with job families and dynamic job arrivals.
Comput. Oper. Res., 2002
Analysis of a multi-part spares inventory system subject to ambiguous fault isolation.
J. Oper. Res. Soc., 2001
Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date.
Eur. J. Oper. Res., 2001
Dual-based approach for a hub network design problem under non-restrictive policy.
Eur. J. Oper. Res., 2001
Minimizing makespan on a single burn-in oven in semiconductor manufacturing.
Eur. J. Oper. Res., 2000
Reliability optimization of a series system with multiple-choice and budget constraints.
Eur. J. Oper. Res., 2000
Branch-and-price algorithm for a multicast routing problem.
J. Oper. Res. Soc., 1999
Parametric max flow problems in a class of networks with series-parallel structure.
Comput. Oper. Res., 1994
Technical note on a parallel-facilities production planning model with capacity constraints.
Comput. Oper. Res., 1988
A dynamic production scheduling model with lost-sales or backlogging.
Comput. Oper. Res., 1987