Ascensión Zafra-Cabeza

Orcid: 0000-0001-9505-8050

According to our database1, Ascensión Zafra-Cabeza authored at least 13 papers between 2003 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
Stochastic MPC-Based Reconfiguration Approaches for Microgrids.
IEEE Trans. Control. Syst. Technol., May, 2024

Optimal Drug Administration in Cancer Therapy using Stochastic Non-Linear Model Predictive Control.
Proceedings of the European Control Conference, 2024

2023
Blockchain for Energy Trading in Energy Communities Using Stochastic and Distributed Model Predictive Control.
IEEE Trans. Control. Syst. Technol., September, 2023

A Stochastic Model Predictive Control Approach to Deal with Cancerous Tumor Growth.
Proceedings of the 9th International Conference on Control, 2023

2022
Blockchain-based peer to peer energy trading using distributed model predictive control.
Proceedings of the European Control Conference, 2022

2011
A Risk-Based Model Predictive Control Approach to Adaptive Interventions in Behavioral Health.
IEEE Trans. Control. Syst. Technol., 2011

Hierarchical distributed model predictive control for risk mitigation: An irrigation canal case study.
Proceedings of the American Control Conference, 2011

2010
A risk-based strategy for power system optimization.
Proceedings of the 49th IEEE Conference on Decision and Control, 2010

2009
Optimization in reverse osmosis plants through risk mitigation.
Proceedings of the 10th European Control Conference, 2009

2008
Using a risk-based approach to project scheduling: A case illustration from semiconductor manufacturing.
Eur. J. Oper. Res., 2008

2007
Scheduling of combined heat and power plants by considering risk management.
Proceedings of the 46th IEEE Conference on Decision and Control, 2007

2004
Chance constrained project scheduling under risk.
Proceedings of the IEEE International Conference on Systems, 2004

2003
Hybrid Algorithm for Scheduling and Risk Assessment of Projects<sup>*</sup>.
Proceedings of the IFAC Conference on Analysis and Design of Hybrid Systems, 2003


  Loading...