Appa Iyer Sivakumar

According to our database1, Appa Iyer Sivakumar authored at least 29 papers between 1999 and 2018.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2018
Capacity planning with demand uncertainty for outpatient clinics.
Eur. J. Oper. Res., 2018

2014
An inventory-routing problem with the objective of travel time minimization.
Eur. J. Oper. Res., 2014

2013
A simulation based analysis on reducing patient waiting time for consultation in an outpatient eye clinic.
Proceedings of the Winter Simulations Conference: Simulation Making Decisions in a Complex World, 2013

2011
Cycle time simulation study for cluster tool operation in IC fabrication.
Int. J. Manuf. Technol. Manag., 2011

Controlling job arrivals with processing time windows into Batch Processor Buffer.
Ann. Oper. Res., 2011

2009
Criteria selection and analysis for single machine dynamic on-line scheduling with multiple objectives and sequence-dependent setups.
Comput. Ind. Eng., 2009

2008
Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain.
Eur. J. Oper. Res., 2008

Online control of a batch processor with incompatible job families under correlated future arrivals.
Proceedings of the 2008 Winter Simulation Conference, Global Gateway to Discovery, 2008

Experimental study on variations of WIPLOAD Control in semiconductor wafer fabrication environment.
Proceedings of the 2008 Winter Simulation Conference, Global Gateway to Discovery, 2008

Simulation analysis of cluster tool operations in wafer fabrication.
Proceedings of the 2008 Winter Simulation Conference, Global Gateway to Discovery, 2008

2007
Simulation experimental investigation on job release control in semiconductor wafer fabrication.
Proceedings of the Winter Simulation Conference, 2007

Online multiobjective single machine dynamic scheduling with sequence-dependent setups using simulation-based genetic algorithm with desirability function.
Proceedings of the Winter Simulation Conference, 2007

2006
Hierarchical minimization of completion time variance and makespan in jobshops.
Comput. Oper. Res., 2006

Scheduling of single stage assembly with air transportation in a consumer electronic supply chain.
Comput. Ind. Eng., 2006

Pareto control in multi-objective dynamic scheduling of a stepper machine in semiconductor wafer fabrication.
Proceedings of the Winter Simulation Conference WSC 2006, 2006

A bee colony optimization algorithm to job shop scheduling.
Proceedings of the Winter Simulation Conference WSC 2006, 2006

2005
Using simulation based approach to improve on the mean cycle time performance of dispatching rules.
Proceedings of the 37th Winter Simulation Conference, Orlando, FL, USA, December 4-7, 2005, 2005

2004
Look ahead batching to minimize earliness/tardiness measures in batch processes.
Proceedings of the 2004 IEEE Conference on Robotics, Automation and Mechatronics, 2004

Bi-objective schedule control of batch processes in semiconductor manufacturing.
Proceedings of the 2004 IEEE Conference on Robotics, Automation and Mechatronics, 2004

2003
Dynamic scheduling I: simulation-based scheduling for dynamic discrete manufacturing.
Proceedings of the 35th Winter Simulation Conference: Driving Innovation, 2003

Factory scheduling: simulation based scheduling using a two-pass approach.
Proceedings of the 35th Winter Simulation Conference: Driving Innovation, 2003

2002
Modeling methodology: simulation based cause and effect analysis of cycle time and WIP in semiconductor wafer fabrication.
Proceedings of the 34th Winter Simulation Conference: Exploring New Frontiers, 2002

Scheduling & control: shop floor scheduling with simulation based proactive decision support.
Proceedings of the 34th Winter Simulation Conference: Exploring New Frontiers, 2002

Semiconductor manufacturing: simulation based multiobjective schedule optimization in semiconductor manufacturing.
Proceedings of the 34th Winter Simulation Conference: Exploring New Frontiers, 2002

Semiconductor manufacturing: design, development and application of an object oriented simulation toolkit for real-time semiconductor manufacturing scheduling.
Proceedings of the 34th Winter Simulation Conference: Exploring New Frontiers, 2002

2001
A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing.
Comput. Ind., 2001

2000
Simulation based cause and effect analysis of cycle time distribution in semiconductor backend.
Proceedings of the 32nd conference on Winter simulation, 2000

Development of an Object Oriented Simulation Engine for On-Line Simulation and Optimization.
Proceedings of the Proceedings 33th Annual Simulation Symposium (SS 2000), 2000

1999
Optimization of a cycle time and utilization in semiconductor test manufacturing using simulation based, on-line, near-real-time scheduling system.
Proceedings of the 31st conference on Winter simulation: Simulation, 1999


  Loading...